Platinum CV8 Basement Tanking Membrane Kit

The Platinum CV8 Waterproof Membrane Kit combines a clear, nominal 8mm-studded Platinum CV8 Cavity Drain Membrane with the principal components used to position, drill, fix and seal the membrane during installation. Each kit contains one roll of Platinum CV8, a stated quantity of Platinum Waterseal Brick Plugs, Platinum Joint Sealing Membrane Tape and one or two 10mm x 160mm SDS Plus Masonry Drill Bits, depending on the selected kit size.

Available as 10m², 20m² and 40m² kits, it provides a convenient starting package for Type C drained protection waterproofing and damp-proofing applications on suitable walls, floors, vaults, tunnels, basements, cellars, retaining structures and other areas above or below ground level. The membrane forms a controlled cavity between the substrate and the internal finish so moisture and water can be collected and directed to Platinum AquaTrack Drainage Channel, a gravity outlet or a Platinum AquaSump sump-and-pump system.

The included components cover the membrane roll and the stated quantities of core fixing and jointing products; they do not replace a project-specific material take-off. Additional plugs, tape, Waterseal Rope, Corner Tape, drainage channels, sump-and-pump equipment, preparation products, floor build-up materials and finishing components may be required according to the substrate, sheet layout, fixing centres, number of joints, water risk and complete waterproofing design.

Kit & Membrane Size
Sale price £154.80 Regular price
ex. VAT
Regular price £185.76 £185.76 Sale price Regular price £0.00
inc. VAT

The Platinum CV8 Waterproof Membrane Kit combines a clear, nominal 8mm-studded Platinum CV8 Cavity Drain Membrane with the principal components used to position, drill, fix and seal the membrane during installation. Each kit contains one roll of Platinum CV8, a stated quantity of Platinum Waterseal Brick Plugs, Platinum Joint Sealing Membrane Tape and one or two 10mm x 160mm SDS Plus Masonry Drill Bits, depending on the selected kit size.

Available as 10m², 20m² and 40m² kits, it provides a convenient starting package for Type C drained protection waterproofing and damp-proofing applications on suitable walls, floors, vaults, tunnels, basements, cellars, retaining structures and other areas above or below ground level. The membrane forms a controlled cavity between the substrate and the internal finish so moisture and water can be collected and directed to Platinum AquaTrack Drainage Channel, a gravity outlet or a Platinum AquaSump sump-and-pump system.

The included components cover the membrane roll and the stated quantities of core fixing and jointing products; they do not replace a project-specific material take-off. Additional plugs, tape, Waterseal Rope, Corner Tape, drainage channels, sump-and-pump equipment, preparation products, floor build-up materials and finishing components may be required according to the substrate, sheet layout, fixing centres, number of joints, water risk and complete waterproofing design.

Next Day Delivery

Free Delivery Over £250

Help & Advice

Call 01355 222 777Mon.-Fri 8:30am - 4:15pm, or email us

Same Day Dispatch

On in-stock orders placed before 14:00

Great Service

A family business with 30 years experience

Key Features of the Platinum CV8 Waterproof Membrane Kit


✔️ Complete core installation kit containing Platinum CV8 membrane, sealed Waterseal Brick Plugs, double-sided Joint Sealing Membrane Tape and 10mm x 160mm SDS Plus drill bit or bits.

✔️ Available in 10m², 20m² and 40m² options, with clearly stated membrane, fixing, tape and drill-bit quantities for easier ordering and project planning.

✔️ Nominal 8mm-studded cavity drain membrane for managing dampness, water ingress and salts within correctly designed Type C waterproofing systems.

✔️ Clear HDPE membrane allows easier substrate visibility, positioning and drilling, while the included sealed plugs and jointing tape support controlled fixing and sheet-to-sheet sealing.

✔️ Compatible with Platinum AquaTrack and AquaSump water-management systems and suitable for systems designed in line with BS 8102:2022, including complete systems intended to achieve a Grade 3 internal environment.



Complete 8mm Cavity Drain Membrane Kit For Type C Waterproofing

The Platinum CV8 Waterproof Membrane Kit packages the principal products required to begin installing a Type C cavity drain membrane. At its centre is Platinum CV8, a high-quality, clear HDPE membrane with a nominal 8mm-studded profile. The studs form a defined cavity between the existing structure and the new internal finish, allowing water and moisture to move behind the membrane towards a designed collection and discharge route.

Unlike a bonded coating that attempts to resist water directly at the face of the substrate, a Type C system accepts that water may enter the structure and manages it safely on the inside. The membrane is therefore one component of a complete water-management design. The kit makes ordering the core membrane-fixing components more convenient, but drainage, discharge, inspection access, detailing accessories and the intended internal finish must still be assessed and specified for the individual project.


Pre-Selected Fixing, Jointing And Drilling Components

Every kit contains sealed Platinum Waterseal Brick Plugs for mechanically fixing CV8 to suitable masonry, brick, concrete or stone. Each 10mm x 60mm plug has a soft rubber washer that compresses against the membrane to seal the fixing point, together with a central core capable of accepting a suitable 5mm No.10 screw for compatible battens, boards, wall ties or dry-lining supports without creating an uncontrolled second penetration.

Platinum Joint Sealing Membrane Tape is included for joining CV8 sheets at compatible flanges and overlaps. The 30mm-wide, double-sided butyl tape sits inside the lap and bonds one sheet to the next to create a continuous waterproof layer. A 10mm x 160mm SDS Plus masonry drill bit is supplied with the 10m² and 20m² kits, while the 40m² kit contains two. Drill-bit life depends on the substrate, drilling technique and aggregate hardness, so additional bits may be required on dense concrete, hard stone or extended installations.


Controlled Drainage For Damp, Wet And Salt-Contaminated Structures

The CV8 stud profile creates a continuous drainage cavity that separates damp or contaminated masonry from the usable internal space. Within a properly designed system, water entering behind the membrane can move towards Platinum AquaTrack perimeter drainage, cross-floor channel, a gravity outlet or a Platinum AquaSump arrangement selected for the anticipated water flow and project risk.

Platinum CV8 is waterproof, salt inhibiting, root resistant and contaminant resistant, making the kit suitable for underground rooms, damp walls, vaulted spaces and cellar conversions affected by water ingress, residual dampness or salt contamination. Managing moisture within an accessible drained cavity, instead of trapping it in the wall or floor build-up, supports a maintainable internal waterproofing strategy.


Three Kit Sizes For Small, Medium And Larger Installations

The 10m² kit contains a 2m x 5m CV8 roll, 30 Waterseal Brick Plugs, one 30mm x 15m roll of Joint Sealing Membrane Tape and one 10mm x 160mm SDS Plus bit. The 20m² kit contains a 2m x 10m CV8 roll, 50 plugs, one 30mm x 15m tape roll and one drill bit. The 40m² kit contains a 2m x 20m CV8 roll, 100 plugs, one 30mm x 30m tape roll and two drill bits.

The quoted square metre figure is the nominal gross area of the supplied membrane roll before allowing for overlaps, trimming, junctions, detailing and site waste. Select the kit from a measured installation layout rather than room floor area alone. Complex corners, multiple sheet joints, openings, service penetrations, close fixing centres or demanding finishing systems may increase consumption and require supplementary packs of plugs, tape or other ancillaries.


Designed For BS 8102:2022 Type C Waterproofing Systems

Platinum CV8 is suitable for use as a component within Type C drained protection systems designed in accordance with BS 8102:2022, the current British Standard code of practice for protecting below-ground structures against water ingress. The membrane forms the internal drainage cavity, while the wider design must address the structure, groundwater and surface-water risk, drainage capacity, discharge route, inspection access, pump provision, redundancy, alarms, maintenance and the intended use of the finished space.

Where a dry habitable basement or cellar is required, the complete waterproofing system may be designed to achieve a Grade 3 internal environment. That outcome is provided by the correctly designed, installed, protected and maintained system as a whole; it is not guaranteed by the kit or membrane sheet in isolation. Projects subject to building warranty requirements should be agreed with the waterproofing design specialist, building control body and warranty provider before work begins.


Long-Term Waterproofing For Basements And Refurbishment Projects

When stored, installed, protected and maintained in accordance with the applicable technical recommendations, Platinum CV8 has a stated life expectancy equivalent to the lifetime of the structure. Its clear HDPE construction, drainage capacity and resistance to common damp-related contaminants make the kit a practical option for remedial work, cellar conversion and complete below-ground waterproofing schemes.

Long-term performance depends on the full installation. Joints, fixing points, penetrations and transitions must remain sealed, the membrane must be protected from damage, and all AquaTrack channels, outlets, sump chambers, pumps, alarms and access ports must remain serviceable. The kit provides selected membrane installation components; it does not remove the need for a site-specific drainage design, additional detailing products, competent installation, inspection or planned maintenance.

 

 

Platinum CV8 Waterproof Membrane Kit Contents
Kit Size Platinum CV8 Membrane Roll Platinum Waterseal Brick Plugs Platinum Joint Sealing Membrane Tape 10mm x 160mm SDS Plus Drill Bits
10m² Kit 1 x 2m wide x 5m long roll 30 sealed plugs 1 x 30mm wide x 15m long roll 1 bit
20m² Kit 1 x 2m wide x 10m long roll 50 sealed plugs 1 x 30mm wide x 15m long roll 1 bit
40m² Kit 1 x 2m wide x 20m long roll 100 sealed plugs 1 x 30mm wide x 30m long roll 2 bits

The membrane areas above are nominal roll areas before laps, cutting and waste. The included quantities are the current contents of each kit rather than a guarantee that every ancillary required by a particular design is supplied.



Choosing The Correct Kit And Additional Components

Measure every wall, floor, vault and return that will receive CV8, then plan the sheet orientation and joint positions. Allow for the membrane that will be consumed by overlaps, corners, reveals, columns, wall-to-floor junctions, sump connections, pipe details, repairs and reasonable cutting waste. Where coverage is close to a kit boundary, choose the larger kit or order additional membrane rather than reducing specified overlaps.

Calculate plug demand from the substrate, membrane orientation, sheet edges, openings, internal finish and project fixing centres. The Waterseal Brick Plug technical information gives a general guide of 5 plugs per m² for non-meshed membranes, while the selected kit contains the exact quantity stated in the table. Standard wall fixing centres must not exceed 600mm unless the design requires closer spacing. Order additional sealed plugs whenever the layout or fixing calculation exceeds the kit quantity.

Calculate jointing tape from the actual length of every flange, overlap and compatible sheet-to-sheet connection. Platinum Joint Sealing Membrane Tape is an internal double-sided lap tape, not a wide face-applied detailing tape. Platinum Waterseal Rope, Platinum Corner Tape, collars, sleeves and membrane patches may still be required at stud-to-stud joints, corners, wall-to-floor transitions, repairs, protrusions and complex three-dimensional details.

The kit does not include AquaTrack channel or components, AquaSump equipment, gravity outlets, alarms, battery back-up, preparation treatments, repair mortars, insulation, screed, dry lining or decorative finishes. Specify these separately from the water-risk assessment and complete Type C system design.



Product Benefits

  • Convenient Core Installation Package: One product selection supplies the CV8 membrane roll, a stated quantity of sealed fixing plugs, the appropriate kit length of double-sided jointing tape and one or two correctly sized SDS Plus masonry drill bits.

  • Three Clearly Defined Kit Sizes: The 10m², 20m² and 40m² options suit a range of local repairs, individual wall areas, cellar conversions and larger basement installations, subject to measured coverage and material allowances.

  • 8mm Cavity Drainage Capacity: The nominal 8mm-studded profile creates a defined void between the substrate and internal finish, allowing water and moisture to move behind the membrane towards the designed drainage route.

  • Suitable For Type C Waterproofing Systems: Platinum CV8 is designed for use as part of a drained protection system in line with BS 8102:2022. With suitable drainage, inspection access, discharge and pumping where required, it can contribute to a dry internal environment below ground.

  • Supports Grade 3 System Designs: When incorporated into a correctly designed, installed and maintained cavity drain system, the kit membrane can contribute to the Grade 3 internal conditions normally specified for habitable below-ground spaces where water penetration and dampness are not acceptable.

  • Sealed Mechanical Fixing: Included Waterseal Brick Plugs have soft rubber sealing washers to maintain the fixing detail through the membrane, subject to correct drilling, seating and compression.

  • Purpose-Matched Jointing Tape: Included double-sided butyl tape sits within compatible laps and flanges to bond adjacent membrane sheets into one continuous layer.

  • Clear Membrane For Easier Installation: The transparent sheet allows the installer to see the substrate during positioning, alignment, drilling and plug installation.

  • Waterproof And Salt Inhibiting: The membrane separates internal finishes from damp, moisture-affected and salt-contaminated backgrounds, helping reduce salt migration, staining and deterioration of the new internal build-up.

  • Root And Contaminant Resistant: Platinum CV8 resists roots and contaminants, supporting use in earth-retaining and below-ground environments exposed to ground moisture and variable substrate conditions.

  • Quick Installation With No Membrane Curing Time: CV8 is mechanically fixed or loose-laid, depending on the application, and does not need to cure before the next correctly detailed stage can begin.

  • Long-Term Building Protection: The membrane's stated life expectancy is equivalent to the lifetime of the structure when it is stored and installed in accordance with the recommendations, protected from damage and incorporated into a functioning, maintained system.



Typical Applications

  • Basement Waterproofing: A convenient core membrane package for earth-retained walls and floors forming part of a Type C system connected to AquaTrack, a gravity outlet or a sump chamber.

  • Cellar Conversion Projects: Suitable for measured cellar areas being converted into dry internal spaces for storage, utility use, work or habitation, subject to the complete waterproofing, ventilation and building design.

  • Individual Wall Or Floor Areas: The different kit sizes allow installers to select a package for a local wall, floor or defined project zone, while ordering any extra detailing and drainage components separately.

  • Retaining Walls: Separates new internal finishes from damp, salt-contaminated or water-bearing retaining walls while preserving a drainage route within the cavity.

  • Floor Waterproofing: CV8 can be loose-laid stud-side down on suitable prepared floors, with overlaps sealed and the membrane connected to the designed perimeter or cross-floor drainage arrangement.

  • Vaults And Tunnels: Suitable for vaulted, arched and tunnel structures where the membrane can be held tightly to the substrate and water can drain continuously to a designed collection point. Additional fixings and detailing products are commonly required.

  • Above-Ground Damp Proofing: May be used where internal walls are affected by residual dampness, penetrating damp, salts or defective backgrounds, provided avoidable moisture sources are addressed first wherever practical.

  • Refurbishment Of Damp Properties: Useful where existing walls or floors are damp, contaminated or unsuitable for direct finishes and where minimal disturbance to the existing structure is preferred.

  • Domestic And Commercial Projects: Applicable to residential basements, commercial basements, plant rooms, stores, underground corridors and other areas requiring managed water removal.

  • Projects Requiring Simplified Ordering: Combines the core CV8 membrane, sealed plugs, jointing tape and drilling bit in one product while allowing drainage and project-specific ancillaries to be specified separately.



Standards & Technical References

  • BS 8102:2022 Type C Design: Platinum CV8 is suitable for inclusion within a Type C drained cavity waterproofing design. BS 8102:2022 is a code of practice for the overall waterproofing design and applies to the complete arrangement rather than the kit alone.

  • Grade 3 Internal Environment: A complete system incorporating the Platinum CV8 kit membrane may be designed to achieve Grade 3 conditions for habitable below-ground spaces. The required grade is achieved through the combined performance of the structure, membrane, sealed details, drainage, discharge, pumps where necessary, ventilation, inspection and maintenance provisions.

  • NHBC Chapter 5.4: Where an NHBC warranty or another structural warranty applies, the proposed complete waterproofing system, design documentation, product evidence and installer competency should be submitted for project-specific acceptance. A reference to NHBC Chapter 5.4 must not be treated as automatic acceptance of an individual kit or component.

  • Published Test And Classification Data: The membrane technical information lists water-tightness, tensile, static-loading, compressive-strength and reaction-to-fire results against the standards shown in the tables below. EN 13967:2012+A1:2017 is identified as the harmonised technical specification for the listed essential characteristics.

  • BS 8204-1:2003+A1:2009 Floor Preparation: This current code of practice is relevant to suitable concrete bases and cementitious levelling screeds used within compatible floor build-ups. Structural floor design, membrane drainage and the final finish must still be coordinated separately.

  • Design Life: The stated life expectancy for Platinum CV8 is the lifetime of the structure when the membrane is stored and installed in accordance with the technical recommendations and remains protected within a correctly functioning system. Consumable tools and separate ancillary components have their own service considerations.



Product Performance

The performance values in the following tables apply to the Platinum CV8 membrane, not collectively to the plugs, tape, drill bits or complete waterproofing system. CV8 works by maintaining a studded cavity between the damp or water-bearing substrate and the new internal finish. Water entering the structure is allowed to move within this cavity towards a suitable collection and discharge point instead of becoming trapped behind plasterboard, plaster, screed or flooring.

The nominal 8mm profile provides a useful balance between drainage capacity and internal build-up depth. It offers greater cavity space than a low-profile damp-proof membrane, supporting structural waterproofing applications without the greater floor or wall depth associated with much deeper-studded membranes. It is therefore well suited to basement waterproofing, cellar conversion, retaining-wall and floor-waterproofing projects.

The membrane's waterproof, salt-inhibiting, root-resistant and contaminant-resistant properties help protect internal finishes from challenging substrates. Damp masonry frequently contains soluble salts and other contamination capable of damaging directly applied finishes. By separating the finish from the substrate, CV8 can reduce salt migration, blistering, staining and damp-related deterioration when the membrane, joints and drainage system are detailed correctly.

The included Waterseal Brick Plugs provide sealed mechanical fixing points when drilled through the centre of selected studs into a suitable substrate and driven until the washer seats evenly. The included Joint Sealing Membrane Tape provides a flexible double-sided butyl bond inside compatible overlaps. Neither component compensates for inadequate fixing centres, dusty or wet joint surfaces, poorly formed laps, unsealed penetrations or missing drainage details.

Installation is practical and comparatively fast. The clear membrane can be fitted with limited preparation to otherwise suitable walls, cut with a sharp blade and fixed using the supplied plugs and drill bit. Because the membrane does not dry or cure, follow-on work can proceed once fixing, sealing, drainage connections and inspection are complete. Any wet-applied repair materials, screeds, plasters or adhesives used elsewhere in the build-up must still reach the required condition before covering or decoration.

For the property owner, the principal benefit is the ability to turn damp or wet areas into dry, usable spaces when the kit is incorporated into a suitable waterproofing design. Performance depends on the entire system: water must enter the drainage cavity without obstruction, reach the drainage channel, leave through a safe outlet or pump arrangement, and continue to do so throughout the life of the installation. Kit selection and the presence of included fixing products do not replace site assessment, competent design, installation inspection or maintenance.

 

Technical Data
Technical Data
Feature Result Test Standard
Material HDPE
Unit Weight 0.5kg/m²
Sheet Thickness 0.45mm EN 149-2
Stud Height 7mm
Colour Clear
Water Tightness, 60kPa for 24 Hours Pass EN 1928
Working Temperature -50°C to +80°C
Softening Temperature 126°C
Tensile Strength, Machine Direction (MD) 416N BS 12311-2
Tensile Strength, Cross Direction (CD) 488N BS 12311-2
Resistance To Static Loading >20kg BS 12730
Compressive Strength 180kN/m² BS EN ISO 25619-2
Reaction To Fire Class E BS EN 13501-1
Type Of Application Type V
Life Expectancy Lifetime of the structure
Essential Characteristics
Essential Characteristic Performance Test Standard Harmonised Technical Specification
Water Tightness, 60kPa for 24 Hours Pass EN 1928 EN 13967:2012+A1:2017
Resistance To Tearing MD: NPD; CMD: NPD EN 12310-1 EN 13967:2012+A1:2017
Elongation (5%) MD: NPD; CMD: NPD EN 12311-2 EN 13967:2012+A1:2017
Compressive Creep / Resistance To Static Load NPD EN 13967 Annex B EN 13967:2012+A1:2017
Impact Resistance NPD EN 12691-2, Method A EN 13967:2012+A1:2017
Durability Against Ageing NPD EN 1296 / EN 1928 EN 13967:2012+A1:2017
Durability Against Chemicals NPD EN 1926 / EN 1928 EN 13967:2012+A1:2017
Fire Resistance Class E EN 13501-1:2007+A1:2009 EN 13967:2012+A1:2017
Joint Tensile Shear Resistance EN 12317-2 EN 13967:2012+A1:2017
Compressive Strength 180kN BS EN ISO 25619-2 EN 13967:2012+A1:2017


Platinum CV8 Kit Components And Ancillary Products
Fixing Products
Product Purpose Within The System
Platinum Waterseal Brick Plugs — included Heavy-duty 10mm x 60mm membrane fixings used to secure Platinum CV8 to suitable brick, concrete, stone and masonry substrates. Each plug is supplied with a soft rubber sealing washer that compresses against the membrane at the fixing point. The central hole accepts a 5mm No.10 screw for battens, ply, wall ties and suitable dry-lining supports without drilling a separate penetration through the membrane. The quantity depends on the selected kit and must be checked against the actual fixing layout.
Evolution 10mm x 160mm SDS Plus Masonry Drill Bit — included Correct-diameter SDS Plus masonry bit for drilling the 10mm holes required by Waterseal Brick Plugs. The 160mm bit has an approximate 100mm working length. One bit is supplied in the 10m² and 20m² kits and two in the 40m² kit. Bit life depends on substrate and technique, so replacements may be required.
Platinum Waterseal Rope — additional product Flexible butyl rope used around the neck of a Waterseal Plug where the standard sealing washer is omitted or cannot seat evenly, including selected overhead, curved, vaulted or irregular details. It must be compressed sufficiently to form a continuous watertight seal around the fixing point.
Jointing, Sealing And Detailing Products
Product Purpose Within The System
Platinum Joint Sealing Membrane Tape — included Double-sided butyl tape used within membrane overlaps, flanges and compatible stud-to-stud laps to join adjacent CV8 sheets into one continuous waterproof layer. It is installed inside the overlap rather than used as a surface-covering tape. The included roll is 30mm wide and either 15m or 30m long according to the selected kit.
Platinum Waterseal Rope — additional product Permanently flexible butyl sealing bead used around fixing plugs, stud-to-stud joints, pipework, services, protrusions, vault details and irregular three-dimensional areas where a flat tape cannot form a complete seal.
Platinum Corner Tape — additional product Wide face-applied butyl tape used at wall-to-floor transitions, corners, repairs, protrusions, patches and complex details requiring a broader surface seal. It may also be used as an additional over-seal where the design anticipates severe water ingress.
Platinum Mesh Tape — additional product Fleece-faced self-adhesive tape that may provide additional support at selected mitred, shaped or finishing details. It is not a substitute for the primary butyl waterproof joint and should be used only where the specified detail and finish require it.
Pipe Collar, Pipe Sleeve Or Proprietary Penetration Seal — additional product Purpose-made accessory for forming a controlled seal where a pipe, cable group, duct or conduit must pass through the membrane. The collar or sleeve must be compatible with the service material and fully sealed to the CV8 sheet.
Drainage And Water Management Products
Product Purpose Within The System
Platinum AquaTrack Drainage Channel Perforated PVC perimeter channel installed at the vulnerable wall-to-floor junction to collect water from behind the wall membrane and direct it towards the designed gravity outlet or sump chamber. The channel includes an upstand for integration at the perimeter.
Platinum AquaTrack Floor Drain Channel Perforated cross-floor channel without an upstand, used to link perimeter drainage to a central sump or to maintain drainage across details such as door thresholds where a standard upstand would obstruct the build-up.
Platinum AquaTrack Connector Piece Straight connector used to join AquaTrack channel sections end to end and maintain continuity along a drainage run.
Platinum AquaTrack Swept Corner Piece Preformed corner component for changes of direction. Its swept arrangement supports water flow and easier maintenance, while its push-out detail can accept an AquaTrack Inspection Port.
Platinum AquaTrack T-Piece Three-way connector used where channel routes meet, particularly when joining perimeter AquaTrack to cross-floor AquaTrack Floor Drain and directing water towards a centrally located sump. Includes a push-out for an Inspection Port.
Platinum AquaTrack Universal End Cap Dual-purpose channel termination. It can blank off the end of a run or, by using the push-out, provide a reduced outlet for connection to suitable 40mm plumbing pipe leading towards a sump or discharge detail.
Platinum AquaTrack Inspection Port Access component fitted to compatible corner and T-piece push-outs so the drainage channel can be inspected, flushed and cleared. Inspection access should be provided at changes of direction and wherever required by the drainage design.
Platinum AquaTrack In-Line Access Port Preformed access port incorporated into a short channel section and connected with AquaTrack Connector Pieces. Used to provide cleaning and inspection access along straight or extended drainage runs.
Platinum AquaTrack 110mm Drainage Channel Outlet T-section outlet used to connect AquaTrack Drainage Channel or Floor Drain Channel to standard 110mm round pipe. Includes a push-out for an AquaTrack Inspection Port.
Platinum AquaTrack 90° In-Line Drainage Connector Preformed level-change connector fitted to a short section of channel. It connects to suitable 40mm pipe from the underside of the channel where the design needs to transfer water between levels.
Platinum AquaSump Basement Sump And Pump Systems Sump chambers and pump stations used to collect water from AquaTrack and remove it mechanically where a dependable gravity discharge is not available. Pump number, duty, head, discharge distance and redundancy must suit the design water flow and risk assessment.
Gullies And Gravity Drainage Connections Suitable designed discharge points used where site levels allow water to leave the cavity drain system by gravity. The outlet must remain capable of accepting the anticipated flow without backing up into the system.
Discharge Pipework And Non-Return Components Correctly sized pipework, valves and fittings that carry pumped water from the sump to the approved discharge point while preventing unwanted return flow.
Platinum AquaAlarm 9V And Platinum AquaAlarm Wireless High-water-level alarms used to warn the building user if water rises above the normal operating level in the sump chamber, providing early notice of a pump, discharge or power problem.
Pump Battery Back-Up System Back-up power provision used where the waterproofed area relies on mechanical pumping and the risk assessment requires continued pump operation during a mains failure. Capacity must be selected for the pump load, likely outage duration and expected water ingress.
Platinum AquaAlarm Elite Telemetry Enhanced monitoring and notification option for projects requiring remote warning of high water, power interruption, servicing needs or other defined system conditions.
Newton Condensation Strip Optional edge detail used where a deep floor build-up prevents the perimeter channel from collecting condensation running down the room-facing side of the wall membrane. It maintains a route from the membrane face to the drainage zone.
Preparation And Supporting Products
Product Purpose Within The System
Wykamol Anti-Lime Sealer Concentrated anti-lime treatment for suitable old or new concrete surfaces. It helps reduce free-lime leaching and dust that could otherwise create deposits in the cavity or AquaTrack channels. Apply in accordance with the separate product instructions.
Lignum Pro M50 Masonry Biocide Biocidal surface treatment used after brushing away visible mould or masonry fungal contamination and before the membrane is installed. Dry rot requires a separate detailed assessment rather than simple concealment behind the membrane.
DampSolve Damp Proof DPC Cream Injection cream used where an appropriate above-ground damp-proof course is required to control avoidable moisture movement before CV8 is installed. It is not a substitute for the Type C drainage system below ground.
Platinum Fillet Seal Mortar Rapid-curing, non-shrink cement-based mortar used to make good, re-profile or form suitable fillet details at wall-to-floor and wall-to-wall junctions where required by the preparation or combined waterproofing design. Allow repair work to reach the required condition before covering.
Renderproof Waterproofing Additive Waterproofing and salt-inhibiting additive for suitable sand-and-cement repair mixes used to level or make good backgrounds before installing CV8. All new work must be allowed to dry thoroughly.
Damp Proof Course Membrane Sheet DPC used where waterproofing or damp-proofing continuity is required through an internal wall, reveal or floor junction. The DPC can be linked to CV8 with Platinum Joint Sealing Membrane Tape and over-sealed with Platinum Corner Tape where the design requires it.
Wykamol High Load Closed Cell Insulation High-load insulating drainage spacer for suitable floor build-ups. Its grooved face supports drainage beneath the floor finish while providing thermal insulation and load-bearing support. Use only as part of a compatible specified build-up.
Newton CDM Fibran XPS 500-C 50mm closed-cell XPS thermal spacer with a grooved drainage face and shiplap edges, used in compatible basement floor build-ups requiring insulation, drainage and high compressive resistance.

 

 

Health & Safety And Installer Competency

Platinum CV8 should be installed by competent operatives who understand damp proofing, structural waterproofing and Type C drained protection. The sheet is straightforward to cut and fix, but the finished system depends on correct assessment, preparation, fixing, jointing, drainage, discharge, protection and maintenance access. Platinum CV8 must not be treated as a stand-alone barrier capable of resisting hydrostatic pressure without a functioning drainage route.

A waterproofing design specialist should be involved where required by BS 8102:2022, the complexity of the work, the intended use of the space, building-control requirements or the structural warranty provider. Habitable basements, high water-risk sites, pumped systems, combined waterproofing designs and projects with complex penetrations or level changes require particularly careful coordination.

Follow normal site precautions. Although the membrane itself is not expected to create a specific hazard during normal handling, drilling, cutting, hammering, heat-gun use and work in confined below-ground spaces introduce their own risks. Basements and cellars may have restricted lighting, ventilation, access and escape routes. Complete the appropriate risk assessments, confirm safe access and provide adequate lighting and ventilation before starting.

Wear suitable PPE for the work, which may include gloves, hard hat, eye protection, high-visibility clothing, safety footwear, hearing protection and respiratory protection when drilling dusty masonry. Follow the safety information for every chemical preparation, mortar, biocide, sealer, adhesive and ancillary product used with the membrane.

Before drilling, scan for concealed electrical cables, water pipes, gas services and other hazards. Plan all fixing lines, membrane joints, AquaTrack routes, sump positions, service entries and final finishes in advance. Drill through the centre of the selected membrane stud and control dust so that excessive debris does not fall into the cavity or drainage channel. Use correctly erected access equipment for high walls, vaults and soffits.



System Design Principles

Platinum CV8 is an 8mm-class cavity drain membrane for Type C waterproofing and damp-proofing systems. Type C construction accepts that some water may pass through the retaining structure and manages it on the inside using a cavity, collection channels and a safe discharge. Where gravity drainage is not dependable, the system normally incorporates a sump chamber and one or more pumps.

The internal cavity relieves and controls water rather than attempting to hold it back at the inner face. For this reason, the design must create an uninterrupted route from every potential entry point to the drainage system. The CV8 cavity, wall-to-floor detail, Platinum AquaTrack, any cross-floor channels, outlets, sump chamber, pump and discharge pipework must work as one coordinated arrangement.

Base the waterproofing design on BS 8102:2022, the water-risk assessment, ground conditions, structure, anticipated water pressure, intended use and required internal environment. A Grade 3 environment may be required for habitable below-ground rooms, but Grade 3 performance is a result of the complete system. It depends on appropriate design, workmanship, drainage capacity, pump provision, ventilation, maintenance and protection from later damage.

If drainage channels become blocked, water entry exceeds the design capacity, the gravity outlet backs up, a pump fails or mains power is lost, the waterproofed space may be at risk. Inspection ports, accessible sump covers, high-water alarms, pump redundancy and battery back-up should therefore be considered at design stage rather than added after the installation is concealed.

For below-ground and earth-retaining structures, the designer must also determine whether combined waterproofing protection is necessary. Depending on the risk and warranty requirements, this may combine Type C with a compatible Type A barrier or Type B water-resistant structure. Platinum CV8 can form the internal drained protection element, but the complete specification must be selected and approved for the particular project.



Suitable Substrates

Platinum CV8 can be installed on suitable walls, floors, vaults, tunnels and other structures above or below ground level. Typical backgrounds include concrete, brickwork, blockwork, stone, masonry, sound render and sound screed, provided the construction is stable, capable of accepting the specified fixings and suitable for the intended drainage and finishing build-up.

For new floor construction, concrete bases should be laid in accordance with BS 8204-1:2003+A1:2009. The CV8 technical information calls for a flat surface with no more than 5mm deviation beneath a 3000mm straightedge. Controlled falls, local drainage details and the structural design must also be coordinated with the waterproofing layout.

Assess existing walls and floors before installation. Remove or repair unsound plaster, weak render, defective screed, friable masonry, sharp projections, severe depressions and unstable areas. CV8 generally needs less preparation than a fully bonded tanking product, but the background must still hold the fixings, allow the sheet to lie without damaging stress points and permit water to reach the drainage system without obstruction.

Do not install over unassessed structural movement, active collapse, contaminated surfaces requiring specialist remediation or hazardous materials. Structural cracks, failed joints and active water flows may require engineered repair or water-stopping measures before the Type C system is completed.



Preparation Of Walls, Floors And Soffits

Remove unsound plaster, render and screed, then level or re-profile the substrate where required. Platinum Fillet Seal Mortar or a suitable 3:1 sand-and-cement repair mix incorporating Renderproof Waterproofing Additive may be used for appropriate repairs. Follow the separate product instructions and allow new cementitious work to dry thoroughly before installing the membrane or applying butyl tapes.

Brush away visible mould and masonry fungal contamination, then treat the prepared surface with Wykamol Microtech Masonry Biocide in accordance with its current technical and safety information. If dry rot is present, stop and arrange a detailed assessment of the moisture source, affected timber and adjoining construction. A membrane must not be used to conceal unresolved timber decay.

Above ground level, repair avoidable sources of moisture wherever practical. Check rainwater goods, external ground levels, pointing, render, plumbing, roofs, flashings and other defects. Where rising damp control is appropriate, DampSolve Damp Proof DPC Cream may be installed to the correct specification before CV8. This reduces unnecessary moisture loading and helps protect surrounding masonry and timber.

Treat concrete walls and slabs with Wykamol Anti-Lime Sealer where new concrete, free lime, efflorescence or dusting could affect the cavity drain system. Lime carried by water can harden within drainage routes and increase maintenance or blockage risk. Prepare, dilute, apply and cure Anti-Lime Sealer strictly in accordance with its own instructions; do not apply it to pooled water or unsuitable surfaces.

Clean the final background and remove loose debris before closing the cavity. Pay particular attention to the wall-to-floor junction, channel troughs, sumps and access details. Construction debris left behind the membrane can restrict drainage, contaminate the channel or make later flushing more difficult.


Platinum CV8 Cavity Drain Waterproof Membrane (8mm Stud) - Basement Waterproof Membranes

Anti-lime sealer being applied to prepared concrete before installation of Platinum CV8 Waterproof Membrane.

 


Tools And Ancillary Products Required

Typical installation tools include an SDS Plus hammer drill, the included 10mm x 160mm masonry bit, spare or alternative-length 10mm bits where required, a rubber mallet or club hammer, sharp utility knife with spare blades, tape measure, long level, straightedge, marker, clean rags, soft roller or firm hand-pressure tool for tapes, and a suitable vacuum or dust-control arrangement. A laser level is useful for long runs, plug lines, channel setting-out and floor levels. Provide suitable task lighting and access equipment for basements, high walls and vaults.

A controlled hot-air gun may be useful for removing light surface moisture and improving butyl-tape adhesion in cold conditions, but it must not overheat, melt or distort the HDPE membrane. Open flames must never be used. All surfaces receiving tape or rope must be clean, dry and free from dust, grease, condensation and loose material.

The kit supplies the stated quantity of Platinum Waterseal Brick Plugs and Joint Sealing Membrane Tape. The complete system may also require extra plugs or tape, Platinum Waterseal Rope, Platinum Corner Tape, suitable patching materials, AquaTrack perimeter and floor channels, the required AquaTrack connectors and outlets, inspection or in-line access ports, and a correctly selected gravity outlet or AquaSump system. Where pumping is essential, also provide the specified discharge components, high-water alarm and any required secondary pump, back-up power or telemetry.

Do not assume that selecting a kit means every project component is present. Do not begin fixing the membrane until the kit contents have been checked, all additional critical products are available and the installation sequence has been agreed. Leaving unfinished joints, missing drainage connections or inaccessible temporary details increases the chance of contamination and damage before the system is closed.



Drainage Requirements

Platinum CV8 must form part of a drainage-based waterproofing system. The cavity behind the membrane requires a clear and maintainable route to a safe discharge; without it, water can accumulate and the system cannot perform as intended. Platinum AquaTrack Drainage Channel is installed at the vulnerable wall-to-floor junction to collect water from behind the wall membrane. Platinum AquaTrack Floor Drain Channel can provide cross-floor connections, threshold drainage or a route to a centrally positioned sump.

Set out channel routes and levels before installing the membrane. Confirm the proposed trough, wall-membrane termination, floor-membrane link, sumps and outlets with the waterproofing design. AquaTrack Connector Pieces join straight channel lengths; Swept Corner Pieces form direction changes; T-Pieces join three routes or connect perimeter channel to Floor Drain; and Universal End Caps either terminate a run or provide a reduced pipe outlet where the designed detail permits.

Use the AquaTrack 110mm Drainage Channel Outlet where channels must connect to a standard 110mm pipe. Use the AquaTrack 90° In-Line Drainage Connector where a level change requires connection from the underside of the channel into suitable 40mm pipe. These are design components rather than interchangeable accessories, so choose the outlet by pipe size, flow requirement, sump arrangement and available levels.

Maintenance access is essential. Install AquaTrack Inspection Ports at compatible Swept Corner and T-Piece push-outs, including changes of direction, and use AquaTrack In-Line Access Ports where longer straight runs require additional access. Position every port so it remains reachable after screed, flooring, dry lining and skirting are installed. Never conceal a maintenance point permanently behind a fixed finish.

Where gravity drainage is unavailable, connect the channel system to a correctly sized Platinum AquaSump. Select pumps for the expected flow, vertical head, pipe resistance and discharge distance. The waterproofing designer should consider pump redundancy, non-return valves, high-water alarms, power failure, battery back-up and the consequences of pump downtime. Route discharge water to a lawful, suitable point where it cannot return towards the structure.

Before covering the system, flush or water-test the channels and confirm free flow to the outlet or sump. Check connectors, corners, access ports and sump entries for debris or displacement. Test pumps, floats, alarms and any back-up or telemetry equipment in accordance with their instructions.



AquaTrack Channel Preparation And Installation

Coordinate the AquaTrack layout with the waterproofing drawings before breaking out the floor. Each standard perimeter channel section is 2m long, approximately 80mm wide and 50mm high with an additional 60mm upstand. The current AquaTrack installation information describes a perimeter trough approximately 130mm wide x 130mm deep, but the final excavation must suit the structure, levels, channel connections, reinforcement, services and project design.

Install the wall membrane first and take it down into the drainage zone. The AquaTrack guidance calls for the cavity drain membrane to extend at least 100mm below the existing floor level so water from the wall cavity can reach the channel. Keep the membrane face and trough free from masonry fragments, drilling dust and hardened mortar.

Place a shallow, stable bed of clean 20mm stone in the prepared trough. Set the AquaTrack channel on the stone with the upstand uppermost and the flat side held against the waterproofed wall. Check level and continuity as the work proceeds. Join straight lengths with AquaTrack Connector Pieces and install the specified Swept Corners, T-Pieces, End Caps, outlets and access ports at the planned locations.

Use AquaTrack Floor Drain Channel without an upstand where the design needs a cross-floor connection or a low-profile threshold detail. Connect it to perimeter AquaTrack with the purpose-made T-Piece and route it to the sump or outlet without local backfalls. Use the 110mm outlet, 90° In-Line Connector or Universal End Cap outlet only with the compatible pipe size and connection arrangement described for that component.

After the channel is connected, backfill the remaining trough space with clean 20mm stone and finish it level with the top of the channel. Where a floor membrane is included, carry it over the stone-filled zone and seal it to the wall-membrane detail with the specified Joint Sealing Membrane Tape and Corner Tape arrangement while preserving the intended water entry into AquaTrack. Where no floor membrane is used, the AquaTrack guidance describes a 50mm screed finish over the perimeter detail, subject to the approved waterproofing and floor design.

Keep every Inspection Port and In-Line Access Port visible and removable after the floor and wall finishes are complete. Flush the installed channel before concealment, observe the water at the sump or gravity outlet, and rectify any obstruction, backfall, open connector or displaced component before proceeding.


Platinum CV8 Cavity Drain Waterproof Membrane (8mm Stud) - Basement Waterproof Membranes

AquaTrack Drainage Channel being installed at the wall-floor junction with Platinum CV8 Membrane, helping manage water ingress within a Type C basement waterproofing system.

 


Wall Installation

Install Platinum CV8 with the studs facing the wall. The studded profile must sit against the substrate so that it creates the drainage cavity behind the smooth room-facing surface. Plan the sheet orientation, flange positions, joint direction, fixing lines, wall-to-floor termination and final lining before cutting or drilling.

Offer the first sheet to the wall and align it accurately. CV8 may be installed vertically or horizontally where the system design and site handling permit, but all overlaps must shed water towards the cavity and must not leave an unsealed edge capable of directing water into the internal finish. Keep the sheet tight to corners and prevent unnecessary bridging, tension or creasing.

Drill through the centre of a membrane stud into sound substrate using the bit size required for the Platinum Waterseal Brick Plug. Make the hole deep and clean enough for the plug to seat fully. Control drilling dust so it does not accumulate behind the membrane or enter AquaTrack.

Insert the plug and drive it home with a rubber mallet or club hammer until the soft sealing washer is evenly compressed against the membrane. The washer must sit flat and must not be split, folded or displaced. Where a separate butyl fixing seal is specified because the washer is omitted or cannot seat correctly, form a complete compressed seal around the plug neck with Platinum Waterseal Rope.

For standard wall areas, space plug fixings no more than 600mm apart unless the project design, substrate, board dimensions or finishing system requires closer centres. Increase restraint where necessary at sheet edges, corners, openings and irregular areas. Align fixing rows with planned battens or support components so later trades can use the plug heads instead of creating new penetrations.


Platinum CV8 Cavity Drain Waterproof Membrane (8mm Stud) - Basement Waterproof Membranes

Platinum CV8 Membrane installed on basement walls, with sealed joints and brick plug fixings creating a controlled cavity to manage moisture and direct water towards the drainage system.



Wall Fixing Centres And Internal Finishes

Choose fixing centres to suit the selected internal finish. For a battened or stud-framed lining, install Waterseal Plugs in vertical rows roughly corresponding with the support positions. Timber battens should be at least 25mm x 38mm where following the source installation arrangement. Fix suitable battens or brackets into the plug cores with 5mm No.10 screws of a controlled length that cannot pass through the plug and puncture the membrane.

If substrate condition prevents plug heads from following a straight support line, compatible dry-lining brackets may be used to align the battens. The bracket and screw arrangement must use the existing sealed plug positions and must not introduce uncontrolled membrane penetrations.

On reasonably flat walls, the serrated heads of Platinum Waterseal Brick Plugs may provide fixing points for a compatible dot-and-dab board system where the project specification permits it. Apply the board adhesive to the plug heads rather than directly to the unsupported membrane. If following the source dry-lining arrangement, conventional bonding plaster is applied in dabs at least 8mm thick and covering at least 50% of the membrane area. Confirm adhesive, board, fire and moisture compatibility for the particular project before use.

Platinum CV8 is a non-meshed membrane and is not intended to receive direct plaster or render. Where a direct wet-plaster or render finish is required, specify a suitable meshed cavity drain membrane instead. CV8 should be protected by a compatible dry-lining system, independent frame, battened board finish, permitted dot-and-dab lining, blockwork lining or other designed finish that does not puncture or overload the waterproofing layer.




Jointing And Sealing

Use the flange along the edge of the CV8 sheet to form the principal overlap wherever possible. The flange is the flat band without studs. Place Platinum Joint Sealing Membrane Tape inside the overlap, align the adjoining sheet and compress the complete joint firmly so that the butyl tape makes uninterrupted contact with both membrane surfaces.

On vertical wall runs, arrange the flanges vertically and place each new sheet in front of the preceding sheet so water is directed into the drainage cavity rather than towards an open edge. At a horizontal joint, position the lower sheet in front of the upper sheet. Plan the sequence before fixing because reversing a lap can create a ledge that traps debris or directs water towards the room-facing side.

Both surfaces must be clean, dry and free from dust, grease and condensation before applying tape or rope. Wipe the membrane with clean rags and allow it to dry. In a cold or damp environment, a hot-air gun may be used cautiously to remove surface moisture and gently warm the jointing area, but the HDPE must not be overheated, softened or distorted. Open flames must not be used.

For a non-flanged or irregular stud-to-stud joint, form the specified seal with Platinum Waterseal Rope, shaped and compressed into the profile so no route remains through the joint. Platinum Joint Sealing Membrane Tape may also be used in compatible stud-interlock details where it can be fully compressed between clean mating surfaces.

Where severe water ingress is present or reasonably foreseeable, add a wider face seal with Platinum Corner Tape if required by the design. Corner Tape is also useful at wall-to-floor transitions, patches, protrusions and awkward junctions. It does not remove the need for a correctly formed primary overlap beneath it.

Seal mitres, shaped cuts, columns, vault sections, pipe details and three-dimensional junctions with the appropriate combination of Joint Sealing Membrane Tape, Waterseal Rope, Corner Tape, membrane patches and compatible collars or sleeves. Platinum Mesh Tape may provide additional finishing or reinforcement support where specified, but it must not be relied upon as the sole waterproof seal.

Roll or press every joint along its full length. Inspect for fish-mouths, bridged sections, trapped dust, stretched membrane and insufficient compression before the next sheet or finish hides the detail.



Wall-To-Floor Junction And AquaTrack Integration

The wall-to-floor junction is commonly one of the highest-risk points in a basement and must be detailed as part of the drainage design. Terminate the wall membrane so water from the cavity can enter Platinum AquaTrack Drainage Channel without passing into the internal floor build-up. Keep the channel inlet zone clear and do not seal the membrane in a way that blocks the intended water path.

Where the AquaTrack product installation arrangement is being followed, form the specified trough at the perimeter, prepare a stable 20mm stone bed, and position the channel with its flat side against the waterproofed wall and the upstand correctly oriented. The exact trough size, channel level and membrane termination must follow the project drawings and current AquaTrack instructions rather than a generic site assumption.

Connect straight channel sections with AquaTrack Connector Pieces and use purpose-made Swept Corners, T-Pieces, End Caps, outlets and access ports rather than improvised cuts. Provide Inspection Ports at direction changes and additional In-Line Access Ports where required. Complete and test the drainage route before laying floor membrane, screed or other permanent finishes.

Where a floor membrane is included, link it continuously to the wall membrane and drainage detail using the specified overlap, Platinum Joint Sealing Membrane Tape and Platinum Corner Tape. The junction must both preserve waterproofing continuity and allow water from the wall cavity to enter AquaTrack; do not create a sealed pocket above or behind the channel.



Floor Installation

Before laying Platinum CV8 on a floor, ensure the slab or screed is clean, stable, reasonably dry at the surface and free from oil, loose material, sharp projections and debris. Repair holes, ridges and severe depressions. New concrete bases should meet the specified flatness requirement of no more than 5mm deviation beneath a 3000mm straightedge, and any designed falls must lead water towards the drainage arrangement rather than create isolated low points.

Apply Wykamol Anti-Lime Sealer to suitable concrete where required to control free-lime leaching and dust. Allow all levelling, repair and anti-lime treatments to reach the condition stated in their individual instructions before closing the floor cavity.

Roll out the membrane with the studs facing down towards the floor so the studded profile creates a drainage space beneath the smooth upper face. Cut with a sharp blade and fit neatly around walls, columns, sumps, drainage channels and unavoidable service details. Avoid excessive small pieces and unnecessary seams.

Lay the next sheet so its flange overlaps the preceding sheet. Apply Platinum Joint Sealing Membrane Tape to clean, dry surfaces inside the overlap and compress the joint firmly along its full length. Where no flange is available, use the designed combination of Waterseal Rope, Joint Sealing Tape, Corner Tape and a membrane patch to create a continuous seal.

Connect the floor membrane to AquaTrack, wall membrane, DPC details, sump entries and other terminations in accordance with the system design. Use Platinum Corner Tape where a broad face-applied seal is required. Check that the completed edge detail does not obstruct water entering the channel from the wall or floor cavity.

If the final floor build-up is too deep for AquaTrack to collect condensation from the room-facing side of the wall membrane, a Newton Condensation Strip may be included as a separate edge route. This deals with surface condensation only; it does not replace cavity drainage behind the membrane.

For a floating floor, CV8 may be overlaid with compatible closed-cell insulation before tongue-and-groove flooring is installed. Maintain a 10mm expansion gap around the perimeter unless the flooring or system design requires otherwise. Alternatively, a conventional sand-and-cement screed approximately 65mm thick may be laid over the membrane where structurally and technically suitable.

Where a high-load insulating drainage layer is needed, specify Wykamol High Load Closed Cell Insulation or Newton CDM Fibran XPS 500-C as part of a compatible build-up. These 50mm-class thermal spacers use a grooved face to preserve drainage and shiplap edges to reduce the risk of screed entering open joints. Follow the board orientation, loading, edge, joint and floor-finish requirements for the chosen product.

Protect the membrane throughout floor work. Use load-spreading boards where necessary, keep reinforcement, tools and sharp offcuts away from the sheet, and prevent screed or adhesive entering drainage cavities or access ports. During relevant wet finishing work, keep atmospheric relative humidity below the limit stated in the technical instructions; the source membrane information specifies below 70% RH during application. Do not install impermeable floor coverings until the screed is dry enough, with the source information requiring screed moisture below 75% RH.



Vaulted Soffit Installation

Platinum CV8 can line vaulted ceilings, arches and sloping underground structures when the membrane can be fixed tightly to the substrate and water can drain continuously to the designed collection point. Survey and set out the vault before cutting. Plan sheet sizes, joint direction, end-wall transitions, fixing density and access so the membrane follows the curve without bridging, excessive tension, deep creasing or sagging.

Measure and cut each section accurately, then hold the studs against the vault while drilling through the centre of selected studs into sound substrate. Use enough fixings to keep the sheet firmly supported over the complete curved surface. Standard Waterseal Plug washers may be used where they sit flat and compress evenly. On details where the washer is deliberately omitted or cannot seat reliably, form a complete seal around the plug neck with Platinum Waterseal Rope in accordance with the specified detail.

Keep cuts to the minimum required. Seal flanged laps with Platinum Joint Sealing Membrane Tape and use Waterseal Rope, Corner Tape, patches and compatible reinforcement at mitres, curved joints, returns and end-wall junctions. Every cut edge and penetration must be inspected before the lining is concealed.

The drainage cavity must remain continuous from the crown and sides of the vault to AquaTrack or another designed collection route. Do not permit the sheet to sag between fixings because low pockets can retain water, sediment and biological debris. Vault work should be undertaken from suitable access equipment by installers able to see and compress every overhead joint safely.



Typical vaulted soffit installation showing Platinum CV8 Waterproof Membrane fixed to a curved vault, with sealed joints, drainage detail and Platinum AquaTrack channel integration.


 

Flat Soffit Restrictions

Do not line a flat below-ground soffit with Platinum CV8 unless it has a reliable minimum slope of 10% towards the designed drainage route. A flat or inadequately sloping overhead surface can allow water to pond behind the membrane, load the fixings, contaminate the cavity and place stress on joints and terminations.

If the soffit does not provide the necessary fall, specify another waterproofing approach. CV8 is better suited to vaulted, arched or sloping overhead construction where gravity can move water to the collection point. Even on a compliant slope, the membrane must remain tight to the substrate and must not sag.



Door Reveals, Corners And Junction Details

Form internal and external corners so the CV8 sheet sits tightly into the angle and provides a well-defined edge for the subsequent lining. Do not bridge across a corner and leave a rounded, unsupported void. Use correctly located Waterseal Plugs to hold the membrane into the angle without overstressing or tearing a stud.

Where the sheet can be folded cleanly, retain the continuous sheet and secure it. Where cutting is necessary, keep the cut controlled and seal the resulting joint with Joint Sealing Membrane Tape, Waterseal Rope, Corner Tape or a purpose-cut patch as required by the geometry. Avoid building several bulky tape layers into a corner unless the detail has space to compress them correctly.

Treat door and window reveals, columns, returns, steps and openings as complete waterproofing details rather than simple trimming points. Lap, wrap or patch the membrane so the drainage cavity remains continuous and all exposed edges are sealed. Coordinate the final lining, frame fixings and threshold before closing the detail; later drilling through a finished reveal is a common route for accidental damage.

Where a sheet DPC passes through an internal wall or reveal, connect it to CV8 with Platinum Joint Sealing Membrane Tape and add Platinum Corner Tape where a wider face seal is required. Maintain continuity with any above-ground damp-proofing arrangement without blocking the Type C drainage route below ground.



Protrusions Through Platinum CV8

Avoid passing pipes, cables, ducts and conduits through Platinum CV8 wherever practical. Each penetration is a potential weakness and must be included on the waterproofing drawings. Re-route services on the room side of the lining or through a planned service zone where possible.

If a penetration is unavoidable, cut the smallest neat opening that permits the service to pass without tearing the membrane. Pack and compress Platinum Waterseal Rope around the service to form a continuous butyl seal. Cover the detail with Platinum Corner Tape or a membrane patch where a broader seal is needed. A compatible pipe collar or sleeve should be fully sealed to both the membrane and the service material.

Allow for pipe movement, vibration, thermal expansion and future maintenance. A rigid tape patch applied over a moving or contaminated pipe may fail even when it initially appears sealed. Clean and prepare plastics, metals and coated services in accordance with the sealing accessory instructions, and use a proprietary collar where simple rope-and-tape detailing cannot accommodate movement.

Floor penetrations require particular care because water can bypass the membrane and enter the finished floor build-up. Use Waterseal Rope, Joint Sealing Membrane Tape and a purpose-cut CV8 or DPC patch as required. Seal the full patch perimeter, inspect it from every side and, where practical, test it before installing insulation, screed or flooring.



Protection Of Platinum CV8 After Installation

Protect CV8 immediately after installation. On walls, protection may be provided by an independent lining, framed dry lining, correctly fixed battens and boards, an approved dot-and-dab system, blockwork or another specified finish. On floors, use compatible closed-cell insulation with tongue-and-groove flooring, an adequately designed screed or another load-spreading build-up that will not puncture the sheet.

Tell every follow-on trade that the waterproof membrane must not be drilled, nailed or screwed through. Use the existing Waterseal Plug cores for approved secondary fixings and select screw lengths that cannot reach beyond the plug. Mark no-fix zones at channels, sumps, pipework and complex details before covering the membrane.

Keep sharp tools, board corners, reinforcement, rubble, heavy point loads and uncontrolled site traffic away from unprotected CV8. Do not drag materials across floor membrane. If temporary protection is removed, reinspect the exposed area before installing the permanent finish.

Protect stored and installed membrane from prolonged direct sunlight, high temperatures and open flame. CV8 is intended to remain protected within the building build-up rather than exposed as a finished surface.



Ventilation And Humidity Control

Platinum CV8 manages water and moisture entering through the structure; it does not remove water vapour generated inside the finished room. Cooking, showering, drying clothes, occupation and inadequate heating can still produce condensation on cold surfaces even when the Type C system is functioning correctly.

Provide an appropriate ventilation, heating and humidity-control strategy for the intended use. Mechanical extract or whole-room ventilation is especially important in bathrooms, kitchens, utility rooms and other high-moisture areas below ground. The ventilation design must comply with the wider building specification and should remain maintainable after occupation.

Do not diagnose condensation as membrane failure without checking humidity, surface temperatures and ventilation, but equally do not assume visible water is condensation until drainage, pumps, joints and penetrations have been inspected. The two sources require different remedial actions.

Where condensation can run down the room-facing surface of the wall membrane and the floor build-up prevents it reaching AquaTrack, consider Newton Condensation Strip as part of the designed edge detail. Keep its route clear and do not bridge it with sealant, plaster, screed or skirting adhesive.



Inspection Before Finishes

Inspect the complete CV8 installation before it is covered. Check the membrane for punctures, cuts, tears, crushed studs, sagging, loose plugs, distorted washers, poorly compressed joints, bridged corners and unsealed penetrations. Confirm that each repair is complete before boards, battens, insulation, screed or flooring make the area inaccessible.

Check every Joint Sealing Membrane Tape overlap for continuous contact. Confirm that Waterseal Rope remains correctly positioned and compressed, and that Corner Tape is fully bonded beyond the edge of each repair or junction. Pay particular attention to the base of walls, door openings, columns, external corners, pipe clusters and vault end details.

Inspect the water-management system separately. Confirm AquaTrack channel position and level; straight connectors; Swept Corners; T-Pieces; End Caps; 110mm or 40mm outlets; Floor Drain links; sump entries; and all Inspection and In-Line Access Ports. Remove debris and verify that each access point remains reachable after the proposed finish is installed.

Flush or water-test the drainage route in accordance with the design. Test all pumps, floats, non-return valves, alarms, battery back-up and telemetry. Confirm the discharge point accepts the flow and does not return water towards the building. Record the inspection and retain photographs of critical details before concealment.



Repairs To Platinum CV8

If a fixing hole is drilled through the wrong stud, clean and dry the area, fill the penetration with Platinum Waterseal Rope and over-seal it with Platinum Corner Tape. Extend the face tape well beyond the damaged point and press it firmly to the prepared membrane. Install the replacement Waterseal Plug through a different stud into sound substrate.

For a small cut or puncture, flatten the damaged area without enlarging it, then bridge it with Corner Tape on clean, dry membrane. The tape must extend beyond the defect on every side and remain fully supported. Remove loose fragments that would prevent adhesion, but do not pull a tear wider.

For a larger hole, cut a CV8 patch with a generous sound margin around the damage. Where the studs interlock neatly, seal the patch perimeter with Platinum Joint Sealing Membrane Tape inside the overlap. Where the profile cannot form a reliable interlock, use Platinum Corner Tape around the complete face perimeter, adding Waterseal Rope beneath irregular sections where required.

Take extra care with floor and vault repairs because these areas may see greater water movement or mechanical loading. A repair that cannot be fully accessed, supported, compressed and inspected should be removed and replaced with a larger membrane section rather than concealed as a doubtful patch.



Maintenance And Future Alterations

Platinum CV8 itself requires little routine attention after it is protected, but the drainage and pumping system must remain accessible and serviceable. Maintain AquaTrack channels, Floor Drain, outlets, access ports, sump chambers, pumps, valves, alarms and discharge pipework in accordance with the waterproofing design and each component manufacturer's instructions.

The AquaTrack product information recommends regular channel cleaning and describes a six-monthly cleaning interval. The actual maintenance plan should reflect the water risk, lime and sediment exposure, pump duty, occupancy and warranty requirements. High-risk or heavily used systems may require more frequent inspection.

Use AquaTrack Inspection Ports at corners and T-Pieces and AquaTrack In-Line Access Ports on straight runs to inspect and flush the system. Keep covers visible or clearly documented and removable. Clean silt and debris from the sump, operate each pump, test floats and non-return valves, check the discharge and confirm every alarm and back-up device works.

Where the waterproofed space relies on pumping, arrange competent servicing and maintain an emergency response plan. Consider a secondary pump, high-water alarm, battery back-up and telemetry where the consequence of failure justifies them. Replace batteries and worn pump components at the intervals specified for the installed equipment.

Control future alterations. Shelving, kitchens, sanitary fittings, skirting, cupboards, floor fixings, new services and later refurbishment must not penetrate CV8 or obstruct AquaTrack without a reviewed waterproofing detail. Provide the owner with drawings, photographs, operating instructions, maintenance schedules and the location of no-fix zones and access points.



Key Limitations

  • Platinum CV8 is one component of a Type C cavity drain system. It must not be relied on as a stand-alone barrier against hydrostatic pressure.

  • Water behind or below the membrane must have a continuous route to AquaTrack, a suitable gravity outlet or a correctly selected sump-and-pump arrangement.

  • The membrane alone does not guarantee a Grade 3 environment. The complete structure, waterproofing design, drainage, pumps, details, finishes, ventilation and maintenance determine the internal result.

  • Kit size describes the nominal gross area of the membrane roll, not guaranteed installed coverage. Allow for overlaps, trimming, corners, junctions, penetrations, repairs and reasonable waste.

  • The included plug, tape and drill-bit quantities are the stated kit contents, not a substitute for a project take-off. Order supplementary components wherever fixing centres, joint lengths, substrate hardness or detailing demand exceeds those quantities.

  • Do not use CV8 on a flat below-ground soffit unless the soffit provides a minimum 10% slope to drainage. Prevent sagging on all overhead applications.

  • CV8 is non-meshed and must not receive direct plaster or render. Use a compatible dry lining or specify a suitable meshed membrane for a direct wet finish.

  • Seal below-ground fixing points with the supplied Waterseal Plug washers or with a correctly compressed Waterseal Rope detail where the washer is omitted by design.

  • Keep tapes and rope clean and dry during installation. Butyl seals will not perform reliably over dust, grease, standing water, condensation or loose material.

  • Do not allow later screws, nails, brackets, services or floor fixings to puncture the membrane. Repair all accidental damage before concealment.

  • Protect the membrane from prolonged UV exposure, sharp objects, high temperatures and open flames.

  • Cavity drain performance depends on inspection and maintenance. Do not conceal AquaTrack access ports, sump covers, alarms or serviceable components.

  • Seek specialist design advice for habitable basements, high water-risk sites, complex structures, combined waterproofing, pumped systems, structural movement or warranty-controlled work.



Storage And Shelf Life

Store Platinum CV8 rolls upright, under cover, on a stable surface and away from prolonged sunlight, high temperatures, ignition sources and open flames. Protect the roll edges and flanges from crushing, contamination and distortion. Do not stack or handle rolls in a way that damages the stud profile.

The stated life expectancy is equivalent to the lifetime of the structure when the membrane is stored and installed in accordance with the technical recommendations. This is an in-service durability statement, not permission to leave rolls exposed indefinitely before installation. Inspect stored material before use and reject sections with heat damage, brittleness, severe distortion, contamination or compromised edges.

Keep Joint Sealing Membrane Tape in its original packaging in clean, dry conditions and protect the butyl faces from dust, moisture, heat and deformation. Keep Waterseal Plug washers clean, flat and undamaged. Store drill bits dry and inspect the cutting head and SDS shank before use. The kit has no single combined shelf-life statement; follow the current storage and service information for each supplied component.



Other Technical Information

Platinum CV8 is manufactured from clear HDPE. The published technical information lists a unit weight of 0.5kg/m², sheet thickness of 0.45mm and stud height of 7mm. The product is described commercially as an 8mm-class or nominal 8mm studded membrane. It passes water-tightness testing at 60kPa for 24 hours to EN 1928.

Published tensile strength is 416N in the machine direction and 488N in the cross direction to BS 12311-2. Resistance to static loading is greater than 20kg to BS 12730. Compressive strength is listed as 180kN/m² in the main technical data to BS EN ISO 25619-2, while the essential-characteristics table reproduces the source declaration format of 180kN.

The listed working temperature range is -50°C to +80°C and the softening temperature is 126°C. Reaction to fire is Class E to BS EN 13501-1, application type is Type V, and life expectancy is stated as the lifetime of the structure when stored and installed in line with the recommendations.

Platinum CV8 can contribute to a Type C system designed under BS 8102:2022, but every project must be assessed as a complete waterproofing arrangement. Product data does not replace a site-specific design, and references to a standard do not constitute third-party product certification.

The 10m² kit contains a 2m x 5m membrane roll, 30 Waterseal Brick Plugs, one 30mm x 15m roll of Joint Sealing Membrane Tape and one 10mm x 160mm SDS Plus bit. The 20m² kit contains a 2m x 10m roll, 50 plugs, one 30mm x 15m tape roll and one bit. The 40m² kit contains a 2m x 20m roll, 100 plugs, one 30mm x 30m tape roll and two bits. These are supply quantities; actual installed coverage and ancillary consumption depend on the project layout and specification.

Q) What is the Platinum CV8 Basement Tanking Membrane Kit?

A) The Platinum CV8 Basement Tanking Membrane Kit is a packaged cavity-drain waterproofing solution intended mainly for below-ground structures. Its principal component is a clear, studded high-density polyethylene membrane that creates a controlled space between the building substrate and the new internal finish. Moisture entering through the wall can move within this cavity towards an appropriate drainage point instead of reaching the finished room. The kit also supplies sealing tape, waterproof brick plugs and a compatible SDS drill bit, helping installers obtain the core items together. It is suitable for projects such as basement conversions, cellars, vaults and tunnels, although drainage components and other detailing materials may still be required.

 

Q) What is included in each Platinum CV8 Basement Tanking Membrane Kit?

A) Every kit contains a roll of Platinum CV8 cavity-drain membrane, Platinum Waterseal Tape, Platinum Waterseal Brick Plugs and a 10mm by 160mm SDS drill bit. The quantities vary with the selected coverage. The 10m² kit contains a 2m by 5m membrane, 30 plugs and one 15m tape roll. The 20m² version contains a 2m by 10m membrane, 50 plugs and one 15m tape roll. The 40m² option contains a 2m by 20m membrane, 100 plugs, one 30m tape roll and two drill bits. Buyers should calculate joints, corners, wastage and fixing requirements before selecting a kit.

 

Q) How does the Platinum CV8 Basement Tanking Membrane Kit work?

A) Platinum CV8 uses an 8mm-class studded profile to hold the membrane away from the wall or floor, creating a cavity behind or beneath the sheet. Water that penetrates the structure is controlled within this space and directed towards a drainage channel, gravity outlet or sump-and-pump system. The room-facing surface isolates the new lining from damp masonry, groundwater and salts. This is a drained-protection approach, commonly called Type C waterproofing. It does not depend on the membrane bonding continuously to the substrate. Effective performance nevertheless requires sealed joints and fixings, an unobstructed drainage route, sufficient discharge capacity and access for maintenance; the membrane should not simply be fitted over a wet surface without planned drainage.

 

Q) Is this kit a complete basement waterproofing system?

A) The kit provides the principal membrane-fixing and lap-sealing components, but it should not automatically be regarded as everything required for a complete basement waterproofing system. A functioning Type C installation normally also needs a designed collection and discharge route, which may include Platinum AquaTrack channels, inspection ports, connectors, an outlet, an AquaSump and one or more pumps. Corners, floor-to-wall junctions, penetrations or stud-to-stud joints may require Waterseal Rope, Corner Tape or additional patches. Floor finishes, wall linings, ventilation and condensation control are separate considerations. The exact specification depends on groundwater risk, structural form, room use and required internal environment, so complex or habitable projects merit specialist waterproofing design.

 

Q) What kit sizes are available, and how do I choose one?

A) Platinum CV8 Basement Tanking Membrane Kits are offered in nominal 10m², 20m² and 40m² sizes. Measure the actual wall and floor surfaces to be covered, including reveals, returns, columns, steps and other irregular areas. Do not select a kit solely from the room’s floor area because a basement’s wall area can be much greater. Add a sensible allowance for cutting, laps, changes of direction, detailing and accidental damage. Also compare the supplied quantities of plugs and tape with the proposed fixing pattern and total joint length; an unusually complex layout may need extra accessories. For multi-room or large commercial work, a drawn membrane layout and materials schedule will produce a more reliable quantity than an approximate measurement.

 

Q) What type of waterproofing is Platinum CV8?

A) Platinum CV8 is intended for Type C drained-protection waterproofing. Rather than attempting to stop all water at the external face or bond a tanking layer tightly to the internal substrate, Type C construction accepts that water may enter the structure and then manages it within a cavity. The membrane separates this water from the occupied space and guides it to a suitable drainage system. The product page refers to BS 8102:2009, but [BSI lists BS 8102:2022](https://knowledge.bsigroup.com/products/protection-of-below-ground-structures-against-water-ingress-code-of-practice) as the current code of practice for protecting below-ground structures against water ingress. Consequently, contemporary projects should be assessed and designed against the current edition, together with applicable building-control, warranty and manufacturer requirements.

 

Q) What are the main advantages of buying the CV8 membrane as a kit?

A) Buying Platinum CV8 as a kit brings together compatible core components and reduces the risk of overlooking basic fixing or lap-sealing materials. The supplied waterproof brick plugs are designed to secure the wall membrane, while the double-sided Waterseal Tape seals overlapping flanged edges. A correctly sized SDS bit is also included, avoiding uncertainty about the drilling diameter. The clear membrane is easy to position and cut, requires relatively limited preparation on sound substrates and has no curing period of its own. Different coverage options suit smaller and larger projects. However, the convenience of a kit should not replace design work: drainage, sumps, junction accessories, finishing materials and any additional fixings must still be specified separately where required.

 

Q) Where can the Platinum CV8 Basement Tanking Membrane Kit be used?

A) The kit is intended primarily for below-ground environments where dampness or water ingress must be controlled. Typical settings include domestic basements, cellar conversions, commercial substructures, underground storage areas, vaults and tunnels. The membrane may be installed on suitable walls and floors and can be used in both refurbishment and new-build work. It is particularly useful where the background is damp, salt affected or unsuitable for dependable adhesion of a bonded coating. Each site still needs an assessment of water-table conditions, drainage, structural stability and intended occupancy. The product should not be treated as a universal solution for every damp problem, especially where condensation, leaking plumbing, defective rainwater goods or structural faults are the principal cause.

 

Q) Is Platinum CV8 suitable for creating a habitable basement?

A) Platinum CV8 can form an important part of a system intended to keep a converted basement dry enough for living, working or similar use. By isolating internal finishes from the damp structure and directing water to drainage, it supports the creation of a controlled internal environment. The membrane alone does not make a basement habitable or guarantee a particular environmental grade. A habitable conversion also requires appropriate insulation, ventilation, heating, floor construction, fire precautions, means of escape, electrical design and compliance with building regulations. Pump redundancy, alarms and backup power may be appropriate where failure would cause serious damage. A waterproofing-design specialist should assess higher-risk schemes and coordinate the membrane with the structure, drainage and final room specification.

 

Q) Can the kit be used on both basement walls and floors?

A) Platinum CV8 can be applied to walls and floors, although the installation and finishing arrangements differ. On a wall, the studs face the substrate and the sheet is mechanically secured using sealed Waterseal Brick Plugs at the specified spacing. On a floor, the membrane is normally loose-laid with the studs down over a clean, stable and sufficiently level base. Floor sheets must be sealed to each other and integrated continuously with the wall membrane and drainage route. The floor then needs a suitable load-spreading build-up, such as closed-cell insulation and tongue-and-groove flooring or an appropriately specified screed. The kit’s plug quantity is principally relevant to wall fixing, so mixed wall-and-floor projects should be measured and detailed carefully.

 

Q) Which substrates are suitable for the Platinum CV8 membrane?

A) The product is suitable for sound concrete, brick, stone and comparable masonry backgrounds commonly found below ground. Existing render, plaster or screed may remain only where it is stable, suitably level and incapable of damaging the membrane; loose or defective material should be removed. The surface must be clean and free from sharp projections, rubble and contaminants that could puncture the sheet or obstruct drainage. For new floors, the product guidance calls for a slab laid to the relevant screed standard, with no more than 5mm deviation beneath a 3,000mm straightedge. Severe hollows, damaged joints and unstable masonry require repair first. Structural movement, active cracking or failing construction should be professionally assessed rather than concealed behind the membrane.

 

Q) How should I prepare a basement before installing the kit?

A) Begin by establishing the source and severity of moisture, checking the structure and confirming where collected water will discharge. Remove loose plaster, weak render, defective screed, sharp projections, dirt and rubble. Repair significant holes or irregularities so the membrane can sit securely without bridging or being punctured. Brush away mould or masonry fungal growth and apply a suitable biocide in accordance with its instructions. Suspected dry rot requires specialist assessment rather than simple concealment. Concrete walls and slabs may need an anti-lime treatment to reduce free-lime deposits that could block drainage. Leaks, defective gutters, high external ground levels and other avoidable moisture sources should be corrected where practical, even though the membrane will manage residual structural water ingress.

 

Q) How is Platinum CV8 installed on a basement wall?

A) Position the membrane with the studs facing the wall and the smooth face towards the room. Arrange sheets so the flanged edges can be overlapped and sealed, keeping the membrane tight into corners rather than bridging them. Drill through the centre of appropriate studs into sound masonry using the supplied 10mm by 160mm SDS bit. Insert sealed Platinum Waterseal Brick Plugs and drive them home carefully with a rubber or club hammer. General fixing centres should not exceed 600mm, although closer spacing may be necessary around edges, openings or to suit the lining system. Control drilling dust so it does not fall into the cavity or channel. Inspect every plug, lap and penetration before covering the installation.

 

Q) How is the membrane fitted across a basement floor?

A) Floor installation normally involves loose-laying Platinum CV8 with its studs facing down over a sound, clean and level slab or screed. Plan sheet positions so laps, wall junctions, drainage channels, columns, sump openings and service penetrations can be detailed without unnecessary small pieces. Cut the HDPE carefully with a sharp blade and protect installed areas from rubble, tools and concentrated traffic. Seal overlaps with the specified Waterseal Tape, using additional compatible accessories where a flange is unavailable. The floor membrane must join the wall system continuously while allowing water to reach the designed channel or collection point. Before insulation, screed or boards are installed, test the drainage route and inspect the surface for punctures, open joints and trapped debris.

 

Q) How far apart should the Waterseal Brick Plugs be installed?

A) The product guidance states that Platinum Waterseal Brick Plugs should generally be installed at intervals no greater than 600mm. This is a maximum general spacing rather than a universal layout for every wall. More fixings may be needed at membrane edges, corners, openings, curved surfaces or where the background is uneven. The pattern should also coordinate with battens, boards, brackets or a stud frame so later finishes can use the sealed plug positions without introducing new holes. Each fixing must enter sound material and pass through the centre of a stud. Fit the required seal for below-ground waterproofing, seat the washer evenly and avoid overdriving it. A waterproofing designer or manufacturer should confirm spacing for unusual substrates or loads.

 

Q) How are membrane joints and overlaps sealed?

A) Use the membrane’s flat flanges for primary overlaps wherever possible. Apply Platinum Waterseal Tape to a clean, dry flange, align the adjoining sheet and compress the entire joint firmly so that no channels, creases or fish-mouths remain. On walls, vertical flanges should overlap the preceding membrane width in a direction that keeps water within the drainage cavity. Where two studded edges meet and a normal flange seal is impossible, the manufacturer identifies Platinum Waterseal Rope as the appropriate additional accessory. Corners, floor-to-wall junctions and complex cuts may also need Corner Tape or purpose-cut patches. Dust, condensation, grease and cold, poorly compressed seals can undermine butyl adhesion, so inspect every joint carefully before it becomes inaccessible.

 

Q) How should corners and awkward shapes be detailed?

A) Platinum CV8 can be cut and shaped around returns, columns, reveals and irregular basement geometry, but every cut creates a detail that must remain watertight and drain correctly. Press the membrane firmly into internal and external corners to form a defined angle; do not leave it spanning across a hollow corner. Use continuous folds where practical. Where cutting or mitring is unavoidable, seal the detail with the appropriate combination of Waterseal Tape, Waterseal Rope, Corner Tape or a membrane patch. Avoid excessive layers that cannot be compressed properly. Plan door thresholds, steps, pipe entries and floor transitions before cutting the main sheets. Photograph and test concealed details, and mark no-fix zones to prevent later trades puncturing vulnerable junctions.

 

Q) Does the CV8 kit need AquaTrack drainage or an AquaSump?

A) A cavity-drain membrane needs a reliable route by which collected water can leave the structure. Platinum AquaTrack is designed for the vulnerable wall-to-floor perimeter and can receive water draining from behind CV8. The channel then directs it to a lawful gravity outlet or to an AquaSump and pump system. Whether both products are required depends on levels, anticipated inflow and the available discharge point, but neither is listed as part of the standard CV8 kit. Channels should include accessible inspection and cleaning points, while pumps must be sized for flow, lift and pipe resistance. Where pump failure would be serious, twin pumps, alarms and backup power may be appropriate. The route should be tested before finishes conceal it.

 

Q) How should services passing through Platinum CV8 be sealed?

A) Minimise penetrations by placing pipes and cables on the room side of the membrane or within a planned service void wherever possible. When a service must pass through CV8, make the smallest neat opening that allows installation without tearing or distorting the sheet. Seal continuously around the penetration with a compatible system, commonly Waterseal Rope combined with Corner Tape, a membrane patch or a suitable proprietary collar. Clean and dry both the membrane and the service surface before applying butyl products. Consider pipe movement, vibration, heat and future replacement rather than making a rigid detail that may separate later. Floor penetrations require particular attention because leakage could enter insulation, screed or floor finishes without being immediately visible.

 

Q) Can the Platinum CV8 kit be fitted to vaulted ceilings or soffits?

A) Platinum CV8 can be fitted to vaulted, curved or sloping below-ground surfaces where water can drain continuously to a collection point. The sheets should follow the profile closely, with suitable fixing density to prevent sagging or pockets. Mitred joints and changes of plane must be sealed meticulously using the recommended tape, rope, corner tape or mesh tape as appropriate. The manufacturer states that the membrane is not suitable for a flat below-ground soffit; such a surface requires a minimum slope of 10 per cent for effective drainage. Overhead work also increases the importance of secure fixings, safe access and inspection. If water could pond above the membrane, a different professionally designed waterproofing solution should be selected.

 

Q) What tools and extra accessories may be needed for installation?

A) The kit supplies the correctly sized SDS drill bit, but installers will normally also need an SDS hammer drill, rubber or club hammer, sharp utility knife, tape measure, straightedge, level, marker, pressure roller, cleaning cloths and effective dust control. Additional materials depend on the detail and may include Waterseal Rope, Corner Tape, membrane patches, anti-lime sealer, fillet material, AquaTrack channel components, inspection ports, an AquaSump and pumps. Compatible insulation, flooring, battens, brackets or lining boards are required for the finish. Personal protective equipment should suit drilling, cutting and site conditions. Gather and check all system components before starting, because improvising corners, outlets or penetrations with unapproved products can compromise drainage and watertightness.

 

Q) Does Platinum CV8 require drying time before finishing?

A) The CV8 membrane itself requires no curing or extended drying period because it is a prefabricated HDPE sheet fixed mechanically to walls or laid over floors. Once the membrane, sealed joints, fixings, drainage connections and penetrations have been inspected and tested, the specified lining or floor build-up can generally proceed without waiting for the membrane to dry. This can reduce programme time compared with wet-applied tanking. Other materials remain subject to their own curing and moisture requirements, including repair mortars, screeds, biocides, anti-lime treatments, adhesives and plasterboard systems. The product guidance says atmospheric moisture should not exceed 70% relative humidity during finishing and impermeable flooring should wait until screed moisture is below 75% relative humidity.

 

Q) Can plaster or render be applied directly over Platinum CV8?

A) Platinum CV8 is a clear, non-meshed cavity-drain membrane, so conventional plaster or render should not normally be applied directly to its smooth surface. The usual approach is to install an appropriate independent stud frame, battens, brackets or another compatible dry-lining system on the room side. Fixing positions should be planned with the Waterseal Brick Plugs so later screws can engage approved plug cores without puncturing the membrane. The product guidance mentions No. 10 screws of 5mm diameter for fixing a stud frame to the plugs, but screw length must remain controlled. Where a directly plastered finish is essential, seek a purpose-designed meshed membrane system and confirm the complete specification rather than attempting to create an improvised key on CV8.

 

Q) What floor finishes can be installed above the membrane?

A) The manufacturer describes two typical floor build-ups above Platinum CV8. One option is suitable closed-cell insulation followed by tongue-and-groove flooring, maintaining a 10mm expansion joint around the perimeter. Another is a conventional sand-and-cement screed approximately 65mm thick. These are general arrangements rather than substitutes for structural and flooring design. The finished construction must distribute imposed loads, protect membrane studs and accommodate insulation, services, thresholds and drainage access. Site conditions may require different thicknesses, reinforcement or specialist boards. Moisture-sensitive and impermeable floor coverings should not be laid until the supporting screed has reached the specified moisture condition; the guidance gives below 75% relative humidity. Sump covers and channel access points must remain reachable after completion.

 

Q) What are the principal technical specifications of Platinum CV8?

A) The membrane is clear, semi-transparent high-density polyethylene with a stated unit weight of 0.5kg/m², sheet thickness of 0.45mm and individual stud height of 7mm, although it is marketed as an 8mm-class membrane. The product page reports a pass for watertightness at 60kPa for 24 hours under EN 1928. Listed tensile strengths are 416N in the machine direction and 488N across it. Static-load resistance exceeds 20kg, while compressive strength is stated as 180kN. The working temperature range is -50°C to +80°C, and softening temperature is 126°C. Reaction to fire is Class E, meaning the membrane should remain protected within a suitably designed building build-up.

 

Q) How durable is the Platinum CV8 membrane?

A) HDPE gives Platinum CV8 strong resistance to water, salts, alkalis, chemicals and common below-ground contaminants. The manufacturer states that, when stored and installed in accordance with its recommendations, the membrane’s life expectancy is equivalent to the lifetime of the structure. This refers to the durable sheet material and does not mean the whole waterproofing installation can be ignored indefinitely. Joint integrity, later punctures, drainage cleanliness, pumps, alarms and discharge pipework all influence long-term performance. The membrane should be stored upright, under cover and away from high temperatures, direct sunlight and open flames. Rolls with crushed studs, damaged flanges or heat distortion should be assessed before use, because defects may reduce drainage or prevent reliable sealing.

 

Q) What maintenance does a completed CV8 waterproofing system need?

A) The concealed CV8 sheet normally requires little direct maintenance, but the water-management system connected to it must remain accessible and operational. AquaTrack inspection points should be retained so channels can be examined and flushed if lime, sediment or debris accumulates. Sumps should be cleaned, pump floats operated, non-return valves checked and discharge pipes inspected. Test high-water alarms, secondary pumps and backup batteries at the intervals recommended by their manufacturers. Maintenance frequency should reflect groundwater risk, pump activity, system design and any warranty conditions. Keep installation drawings and photographs showing channels, junctions, plug rows and no-fix areas. Owners and later contractors should know that careless drilling, inaccessible access covers or blocked channels can defeat an otherwise durable membrane installation.

 

Q) Does Platinum CV8 stop condensation, mould and rising damp?

A) Platinum CV8 controls moisture entering through walls or floors and separates finishes from damp or salt-contaminated masonry, but it does not remove water vapour generated inside the room. Cooking, showering, clothes drying, occupation and cold surfaces can still create condensation and mould unless heating, insulation and ventilation are appropriate. The manufacturer particularly recommends effective mechanical ventilation in poorly ventilated spaces and wet rooms. On floors, the membrane may help isolate finishes from ground moisture when incorporated into a complete drained system, but the source and pathway must still be diagnosed correctly. Above ground, avoidable moisture should be addressed at source, potentially including a suitable damp-proof course. Do not assume every damp patch indicates either condensation or membrane failure without investigation.

 

Q) What are the main limitations of the Platinum CV8 Basement Tanking Membrane Kit?

A) The kit is not a stand-alone answer to hydrostatic water pressure because CV8 must discharge into a continuous, maintainable drainage system. AquaTrack, sumps, pumps, corner products and service seals are not automatically included. The membrane cannot correct structural instability, active movement, untreated dry rot or avoidable leaks, and it does not control internally generated condensation. Direct plastering is unsuitable because CV8 has no mesh key. Flat below-ground soffits are excluded unless an effective minimum 10% drainage slope exists. Butyl seals need clean, dry surfaces, and the membrane must be protected from punctures, prolonged sunlight, extreme heat and flame. Complex, high-risk or habitable schemes should be designed and installed by competent waterproofing specialists using current standards and project-specific details.

 

Q) What practical tips help produce a reliable CV8 installation?

A) Survey and design the full water route before unrolling the membrane, including channels, outlets, sump position, inspection points and final lining supports. Prepare a sheet layout that uses flanged joints efficiently and allows for corners, reveals and wastage. Keep the membrane and butyl products clean, dry and protected; control drill dust so it cannot settle in the cavity. Fix through stud centres, seat every plug seal evenly and use planned plug rows for later framing. Compress tapes continuously and repair accidental holes before concealment. Water-test channels, operate pumps and alarms, and photograph all critical details and no-fix zones. Finally, preserve access for servicing and provide the owner with system drawings, product instructions and a realistic maintenance schedule.

Key Features of the Platinum CV8 Waterproof Membrane Kit


✔️ Complete core installation kit containing Platinum CV8 membrane, sealed Waterseal Brick Plugs, double-sided Joint Sealing Membrane Tape and 10mm x 160mm SDS Plus drill bit or bits.

✔️ Available in 10m², 20m² and 40m² options, with clearly stated membrane, fixing, tape and drill-bit quantities for easier ordering and project planning.

✔️ Nominal 8mm-studded cavity drain membrane for managing dampness, water ingress and salts within correctly designed Type C waterproofing systems.

✔️ Clear HDPE membrane allows easier substrate visibility, positioning and drilling, while the included sealed plugs and jointing tape support controlled fixing and sheet-to-sheet sealing.

✔️ Compatible with Platinum AquaTrack and AquaSump water-management systems and suitable for systems designed in line with BS 8102:2022, including complete systems intended to achieve a Grade 3 internal environment.



Complete 8mm Cavity Drain Membrane Kit For Type C Waterproofing

The Platinum CV8 Waterproof Membrane Kit packages the principal products required to begin installing a Type C cavity drain membrane. At its centre is Platinum CV8, a high-quality, clear HDPE membrane with a nominal 8mm-studded profile. The studs form a defined cavity between the existing structure and the new internal finish, allowing water and moisture to move behind the membrane towards a designed collection and discharge route.

Unlike a bonded coating that attempts to resist water directly at the face of the substrate, a Type C system accepts that water may enter the structure and manages it safely on the inside. The membrane is therefore one component of a complete water-management design. The kit makes ordering the core membrane-fixing components more convenient, but drainage, discharge, inspection access, detailing accessories and the intended internal finish must still be assessed and specified for the individual project.


Pre-Selected Fixing, Jointing And Drilling Components

Every kit contains sealed Platinum Waterseal Brick Plugs for mechanically fixing CV8 to suitable masonry, brick, concrete or stone. Each 10mm x 60mm plug has a soft rubber washer that compresses against the membrane to seal the fixing point, together with a central core capable of accepting a suitable 5mm No.10 screw for compatible battens, boards, wall ties or dry-lining supports without creating an uncontrolled second penetration.

Platinum Joint Sealing Membrane Tape is included for joining CV8 sheets at compatible flanges and overlaps. The 30mm-wide, double-sided butyl tape sits inside the lap and bonds one sheet to the next to create a continuous waterproof layer. A 10mm x 160mm SDS Plus masonry drill bit is supplied with the 10m² and 20m² kits, while the 40m² kit contains two. Drill-bit life depends on the substrate, drilling technique and aggregate hardness, so additional bits may be required on dense concrete, hard stone or extended installations.


Controlled Drainage For Damp, Wet And Salt-Contaminated Structures

The CV8 stud profile creates a continuous drainage cavity that separates damp or contaminated masonry from the usable internal space. Within a properly designed system, water entering behind the membrane can move towards Platinum AquaTrack perimeter drainage, cross-floor channel, a gravity outlet or a Platinum AquaSump arrangement selected for the anticipated water flow and project risk.

Platinum CV8 is waterproof, salt inhibiting, root resistant and contaminant resistant, making the kit suitable for underground rooms, damp walls, vaulted spaces and cellar conversions affected by water ingress, residual dampness or salt contamination. Managing moisture within an accessible drained cavity, instead of trapping it in the wall or floor build-up, supports a maintainable internal waterproofing strategy.


Three Kit Sizes For Small, Medium And Larger Installations

The 10m² kit contains a 2m x 5m CV8 roll, 30 Waterseal Brick Plugs, one 30mm x 15m roll of Joint Sealing Membrane Tape and one 10mm x 160mm SDS Plus bit. The 20m² kit contains a 2m x 10m CV8 roll, 50 plugs, one 30mm x 15m tape roll and one drill bit. The 40m² kit contains a 2m x 20m CV8 roll, 100 plugs, one 30mm x 30m tape roll and two drill bits.

The quoted square metre figure is the nominal gross area of the supplied membrane roll before allowing for overlaps, trimming, junctions, detailing and site waste. Select the kit from a measured installation layout rather than room floor area alone. Complex corners, multiple sheet joints, openings, service penetrations, close fixing centres or demanding finishing systems may increase consumption and require supplementary packs of plugs, tape or other ancillaries.


Designed For BS 8102:2022 Type C Waterproofing Systems

Platinum CV8 is suitable for use as a component within Type C drained protection systems designed in accordance with BS 8102:2022, the current British Standard code of practice for protecting below-ground structures against water ingress. The membrane forms the internal drainage cavity, while the wider design must address the structure, groundwater and surface-water risk, drainage capacity, discharge route, inspection access, pump provision, redundancy, alarms, maintenance and the intended use of the finished space.

Where a dry habitable basement or cellar is required, the complete waterproofing system may be designed to achieve a Grade 3 internal environment. That outcome is provided by the correctly designed, installed, protected and maintained system as a whole; it is not guaranteed by the kit or membrane sheet in isolation. Projects subject to building warranty requirements should be agreed with the waterproofing design specialist, building control body and warranty provider before work begins.


Long-Term Waterproofing For Basements And Refurbishment Projects

When stored, installed, protected and maintained in accordance with the applicable technical recommendations, Platinum CV8 has a stated life expectancy equivalent to the lifetime of the structure. Its clear HDPE construction, drainage capacity and resistance to common damp-related contaminants make the kit a practical option for remedial work, cellar conversion and complete below-ground waterproofing schemes.

Long-term performance depends on the full installation. Joints, fixing points, penetrations and transitions must remain sealed, the membrane must be protected from damage, and all AquaTrack channels, outlets, sump chambers, pumps, alarms and access ports must remain serviceable. The kit provides selected membrane installation components; it does not remove the need for a site-specific drainage design, additional detailing products, competent installation, inspection or planned maintenance.

 

 

Platinum CV8 Waterproof Membrane Kit Contents
Kit Size Platinum CV8 Membrane Roll Platinum Waterseal Brick Plugs Platinum Joint Sealing Membrane Tape 10mm x 160mm SDS Plus Drill Bits
10m² Kit 1 x 2m wide x 5m long roll 30 sealed plugs 1 x 30mm wide x 15m long roll 1 bit
20m² Kit 1 x 2m wide x 10m long roll 50 sealed plugs 1 x 30mm wide x 15m long roll 1 bit
40m² Kit 1 x 2m wide x 20m long roll 100 sealed plugs 1 x 30mm wide x 30m long roll 2 bits

The membrane areas above are nominal roll areas before laps, cutting and waste. The included quantities are the current contents of each kit rather than a guarantee that every ancillary required by a particular design is supplied.



Choosing The Correct Kit And Additional Components

Measure every wall, floor, vault and return that will receive CV8, then plan the sheet orientation and joint positions. Allow for the membrane that will be consumed by overlaps, corners, reveals, columns, wall-to-floor junctions, sump connections, pipe details, repairs and reasonable cutting waste. Where coverage is close to a kit boundary, choose the larger kit or order additional membrane rather than reducing specified overlaps.

Calculate plug demand from the substrate, membrane orientation, sheet edges, openings, internal finish and project fixing centres. The Waterseal Brick Plug technical information gives a general guide of 5 plugs per m² for non-meshed membranes, while the selected kit contains the exact quantity stated in the table. Standard wall fixing centres must not exceed 600mm unless the design requires closer spacing. Order additional sealed plugs whenever the layout or fixing calculation exceeds the kit quantity.

Calculate jointing tape from the actual length of every flange, overlap and compatible sheet-to-sheet connection. Platinum Joint Sealing Membrane Tape is an internal double-sided lap tape, not a wide face-applied detailing tape. Platinum Waterseal Rope, Platinum Corner Tape, collars, sleeves and membrane patches may still be required at stud-to-stud joints, corners, wall-to-floor transitions, repairs, protrusions and complex three-dimensional details.

The kit does not include AquaTrack channel or components, AquaSump equipment, gravity outlets, alarms, battery back-up, preparation treatments, repair mortars, insulation, screed, dry lining or decorative finishes. Specify these separately from the water-risk assessment and complete Type C system design.



Product Benefits

  • Convenient Core Installation Package: One product selection supplies the CV8 membrane roll, a stated quantity of sealed fixing plugs, the appropriate kit length of double-sided jointing tape and one or two correctly sized SDS Plus masonry drill bits.

  • Three Clearly Defined Kit Sizes: The 10m², 20m² and 40m² options suit a range of local repairs, individual wall areas, cellar conversions and larger basement installations, subject to measured coverage and material allowances.

  • 8mm Cavity Drainage Capacity: The nominal 8mm-studded profile creates a defined void between the substrate and internal finish, allowing water and moisture to move behind the membrane towards the designed drainage route.

  • Suitable For Type C Waterproofing Systems: Platinum CV8 is designed for use as part of a drained protection system in line with BS 8102:2022. With suitable drainage, inspection access, discharge and pumping where required, it can contribute to a dry internal environment below ground.

  • Supports Grade 3 System Designs: When incorporated into a correctly designed, installed and maintained cavity drain system, the kit membrane can contribute to the Grade 3 internal conditions normally specified for habitable below-ground spaces where water penetration and dampness are not acceptable.

  • Sealed Mechanical Fixing: Included Waterseal Brick Plugs have soft rubber sealing washers to maintain the fixing detail through the membrane, subject to correct drilling, seating and compression.

  • Purpose-Matched Jointing Tape: Included double-sided butyl tape sits within compatible laps and flanges to bond adjacent membrane sheets into one continuous layer.

  • Clear Membrane For Easier Installation: The transparent sheet allows the installer to see the substrate during positioning, alignment, drilling and plug installation.

  • Waterproof And Salt Inhibiting: The membrane separates internal finishes from damp, moisture-affected and salt-contaminated backgrounds, helping reduce salt migration, staining and deterioration of the new internal build-up.

  • Root And Contaminant Resistant: Platinum CV8 resists roots and contaminants, supporting use in earth-retaining and below-ground environments exposed to ground moisture and variable substrate conditions.

  • Quick Installation With No Membrane Curing Time: CV8 is mechanically fixed or loose-laid, depending on the application, and does not need to cure before the next correctly detailed stage can begin.

  • Long-Term Building Protection: The membrane's stated life expectancy is equivalent to the lifetime of the structure when it is stored and installed in accordance with the recommendations, protected from damage and incorporated into a functioning, maintained system.



Typical Applications

  • Basement Waterproofing: A convenient core membrane package for earth-retained walls and floors forming part of a Type C system connected to AquaTrack, a gravity outlet or a sump chamber.

  • Cellar Conversion Projects: Suitable for measured cellar areas being converted into dry internal spaces for storage, utility use, work or habitation, subject to the complete waterproofing, ventilation and building design.

  • Individual Wall Or Floor Areas: The different kit sizes allow installers to select a package for a local wall, floor or defined project zone, while ordering any extra detailing and drainage components separately.

  • Retaining Walls: Separates new internal finishes from damp, salt-contaminated or water-bearing retaining walls while preserving a drainage route within the cavity.

  • Floor Waterproofing: CV8 can be loose-laid stud-side down on suitable prepared floors, with overlaps sealed and the membrane connected to the designed perimeter or cross-floor drainage arrangement.

  • Vaults And Tunnels: Suitable for vaulted, arched and tunnel structures where the membrane can be held tightly to the substrate and water can drain continuously to a designed collection point. Additional fixings and detailing products are commonly required.

  • Above-Ground Damp Proofing: May be used where internal walls are affected by residual dampness, penetrating damp, salts or defective backgrounds, provided avoidable moisture sources are addressed first wherever practical.

  • Refurbishment Of Damp Properties: Useful where existing walls or floors are damp, contaminated or unsuitable for direct finishes and where minimal disturbance to the existing structure is preferred.

  • Domestic And Commercial Projects: Applicable to residential basements, commercial basements, plant rooms, stores, underground corridors and other areas requiring managed water removal.

  • Projects Requiring Simplified Ordering: Combines the core CV8 membrane, sealed plugs, jointing tape and drilling bit in one product while allowing drainage and project-specific ancillaries to be specified separately.



Standards & Technical References

  • BS 8102:2022 Type C Design: Platinum CV8 is suitable for inclusion within a Type C drained cavity waterproofing design. BS 8102:2022 is a code of practice for the overall waterproofing design and applies to the complete arrangement rather than the kit alone.

  • Grade 3 Internal Environment: A complete system incorporating the Platinum CV8 kit membrane may be designed to achieve Grade 3 conditions for habitable below-ground spaces. The required grade is achieved through the combined performance of the structure, membrane, sealed details, drainage, discharge, pumps where necessary, ventilation, inspection and maintenance provisions.

  • NHBC Chapter 5.4: Where an NHBC warranty or another structural warranty applies, the proposed complete waterproofing system, design documentation, product evidence and installer competency should be submitted for project-specific acceptance. A reference to NHBC Chapter 5.4 must not be treated as automatic acceptance of an individual kit or component.

  • Published Test And Classification Data: The membrane technical information lists water-tightness, tensile, static-loading, compressive-strength and reaction-to-fire results against the standards shown in the tables below. EN 13967:2012+A1:2017 is identified as the harmonised technical specification for the listed essential characteristics.

  • BS 8204-1:2003+A1:2009 Floor Preparation: This current code of practice is relevant to suitable concrete bases and cementitious levelling screeds used within compatible floor build-ups. Structural floor design, membrane drainage and the final finish must still be coordinated separately.

  • Design Life: The stated life expectancy for Platinum CV8 is the lifetime of the structure when the membrane is stored and installed in accordance with the technical recommendations and remains protected within a correctly functioning system. Consumable tools and separate ancillary components have their own service considerations.



Product Performance

The performance values in the following tables apply to the Platinum CV8 membrane, not collectively to the plugs, tape, drill bits or complete waterproofing system. CV8 works by maintaining a studded cavity between the damp or water-bearing substrate and the new internal finish. Water entering the structure is allowed to move within this cavity towards a suitable collection and discharge point instead of becoming trapped behind plasterboard, plaster, screed or flooring.

The nominal 8mm profile provides a useful balance between drainage capacity and internal build-up depth. It offers greater cavity space than a low-profile damp-proof membrane, supporting structural waterproofing applications without the greater floor or wall depth associated with much deeper-studded membranes. It is therefore well suited to basement waterproofing, cellar conversion, retaining-wall and floor-waterproofing projects.

The membrane's waterproof, salt-inhibiting, root-resistant and contaminant-resistant properties help protect internal finishes from challenging substrates. Damp masonry frequently contains soluble salts and other contamination capable of damaging directly applied finishes. By separating the finish from the substrate, CV8 can reduce salt migration, blistering, staining and damp-related deterioration when the membrane, joints and drainage system are detailed correctly.

The included Waterseal Brick Plugs provide sealed mechanical fixing points when drilled through the centre of selected studs into a suitable substrate and driven until the washer seats evenly. The included Joint Sealing Membrane Tape provides a flexible double-sided butyl bond inside compatible overlaps. Neither component compensates for inadequate fixing centres, dusty or wet joint surfaces, poorly formed laps, unsealed penetrations or missing drainage details.

Installation is practical and comparatively fast. The clear membrane can be fitted with limited preparation to otherwise suitable walls, cut with a sharp blade and fixed using the supplied plugs and drill bit. Because the membrane does not dry or cure, follow-on work can proceed once fixing, sealing, drainage connections and inspection are complete. Any wet-applied repair materials, screeds, plasters or adhesives used elsewhere in the build-up must still reach the required condition before covering or decoration.

For the property owner, the principal benefit is the ability to turn damp or wet areas into dry, usable spaces when the kit is incorporated into a suitable waterproofing design. Performance depends on the entire system: water must enter the drainage cavity without obstruction, reach the drainage channel, leave through a safe outlet or pump arrangement, and continue to do so throughout the life of the installation. Kit selection and the presence of included fixing products do not replace site assessment, competent design, installation inspection or maintenance.

 

Technical Data
Technical Data
Feature Result Test Standard
Material HDPE
Unit Weight 0.5kg/m²
Sheet Thickness 0.45mm EN 149-2
Stud Height 7mm
Colour Clear
Water Tightness, 60kPa for 24 Hours Pass EN 1928
Working Temperature -50°C to +80°C
Softening Temperature 126°C
Tensile Strength, Machine Direction (MD) 416N BS 12311-2
Tensile Strength, Cross Direction (CD) 488N BS 12311-2
Resistance To Static Loading >20kg BS 12730
Compressive Strength 180kN/m² BS EN ISO 25619-2
Reaction To Fire Class E BS EN 13501-1
Type Of Application Type V
Life Expectancy Lifetime of the structure
Essential Characteristics
Essential Characteristic Performance Test Standard Harmonised Technical Specification
Water Tightness, 60kPa for 24 Hours Pass EN 1928 EN 13967:2012+A1:2017
Resistance To Tearing MD: NPD; CMD: NPD EN 12310-1 EN 13967:2012+A1:2017
Elongation (5%) MD: NPD; CMD: NPD EN 12311-2 EN 13967:2012+A1:2017
Compressive Creep / Resistance To Static Load NPD EN 13967 Annex B EN 13967:2012+A1:2017
Impact Resistance NPD EN 12691-2, Method A EN 13967:2012+A1:2017
Durability Against Ageing NPD EN 1296 / EN 1928 EN 13967:2012+A1:2017
Durability Against Chemicals NPD EN 1926 / EN 1928 EN 13967:2012+A1:2017
Fire Resistance Class E EN 13501-1:2007+A1:2009 EN 13967:2012+A1:2017
Joint Tensile Shear Resistance EN 12317-2 EN 13967:2012+A1:2017
Compressive Strength 180kN BS EN ISO 25619-2 EN 13967:2012+A1:2017


Platinum CV8 Kit Components And Ancillary Products
Fixing Products
Product Purpose Within The System
Platinum Waterseal Brick Plugs — included Heavy-duty 10mm x 60mm membrane fixings used to secure Platinum CV8 to suitable brick, concrete, stone and masonry substrates. Each plug is supplied with a soft rubber sealing washer that compresses against the membrane at the fixing point. The central hole accepts a 5mm No.10 screw for battens, ply, wall ties and suitable dry-lining supports without drilling a separate penetration through the membrane. The quantity depends on the selected kit and must be checked against the actual fixing layout.
Evolution 10mm x 160mm SDS Plus Masonry Drill Bit — included Correct-diameter SDS Plus masonry bit for drilling the 10mm holes required by Waterseal Brick Plugs. The 160mm bit has an approximate 100mm working length. One bit is supplied in the 10m² and 20m² kits and two in the 40m² kit. Bit life depends on substrate and technique, so replacements may be required.
Platinum Waterseal Rope — additional product Flexible butyl rope used around the neck of a Waterseal Plug where the standard sealing washer is omitted or cannot seat evenly, including selected overhead, curved, vaulted or irregular details. It must be compressed sufficiently to form a continuous watertight seal around the fixing point.
Jointing, Sealing And Detailing Products
Product Purpose Within The System
Platinum Joint Sealing Membrane Tape — included Double-sided butyl tape used within membrane overlaps, flanges and compatible stud-to-stud laps to join adjacent CV8 sheets into one continuous waterproof layer. It is installed inside the overlap rather than used as a surface-covering tape. The included roll is 30mm wide and either 15m or 30m long according to the selected kit.
Platinum Waterseal Rope — additional product Permanently flexible butyl sealing bead used around fixing plugs, stud-to-stud joints, pipework, services, protrusions, vault details and irregular three-dimensional areas where a flat tape cannot form a complete seal.
Platinum Corner Tape — additional product Wide face-applied butyl tape used at wall-to-floor transitions, corners, repairs, protrusions, patches and complex details requiring a broader surface seal. It may also be used as an additional over-seal where the design anticipates severe water ingress.
Platinum Mesh Tape — additional product Fleece-faced self-adhesive tape that may provide additional support at selected mitred, shaped or finishing details. It is not a substitute for the primary butyl waterproof joint and should be used only where the specified detail and finish require it.
Pipe Collar, Pipe Sleeve Or Proprietary Penetration Seal — additional product Purpose-made accessory for forming a controlled seal where a pipe, cable group, duct or conduit must pass through the membrane. The collar or sleeve must be compatible with the service material and fully sealed to the CV8 sheet.
Drainage And Water Management Products
Product Purpose Within The System
Platinum AquaTrack Drainage Channel Perforated PVC perimeter channel installed at the vulnerable wall-to-floor junction to collect water from behind the wall membrane and direct it towards the designed gravity outlet or sump chamber. The channel includes an upstand for integration at the perimeter.
Platinum AquaTrack Floor Drain Channel Perforated cross-floor channel without an upstand, used to link perimeter drainage to a central sump or to maintain drainage across details such as door thresholds where a standard upstand would obstruct the build-up.
Platinum AquaTrack Connector Piece Straight connector used to join AquaTrack channel sections end to end and maintain continuity along a drainage run.
Platinum AquaTrack Swept Corner Piece Preformed corner component for changes of direction. Its swept arrangement supports water flow and easier maintenance, while its push-out detail can accept an AquaTrack Inspection Port.
Platinum AquaTrack T-Piece Three-way connector used where channel routes meet, particularly when joining perimeter AquaTrack to cross-floor AquaTrack Floor Drain and directing water towards a centrally located sump. Includes a push-out for an Inspection Port.
Platinum AquaTrack Universal End Cap Dual-purpose channel termination. It can blank off the end of a run or, by using the push-out, provide a reduced outlet for connection to suitable 40mm plumbing pipe leading towards a sump or discharge detail.
Platinum AquaTrack Inspection Port Access component fitted to compatible corner and T-piece push-outs so the drainage channel can be inspected, flushed and cleared. Inspection access should be provided at changes of direction and wherever required by the drainage design.
Platinum AquaTrack In-Line Access Port Preformed access port incorporated into a short channel section and connected with AquaTrack Connector Pieces. Used to provide cleaning and inspection access along straight or extended drainage runs.
Platinum AquaTrack 110mm Drainage Channel Outlet T-section outlet used to connect AquaTrack Drainage Channel or Floor Drain Channel to standard 110mm round pipe. Includes a push-out for an AquaTrack Inspection Port.
Platinum AquaTrack 90° In-Line Drainage Connector Preformed level-change connector fitted to a short section of channel. It connects to suitable 40mm pipe from the underside of the channel where the design needs to transfer water between levels.
Platinum AquaSump Basement Sump And Pump Systems Sump chambers and pump stations used to collect water from AquaTrack and remove it mechanically where a dependable gravity discharge is not available. Pump number, duty, head, discharge distance and redundancy must suit the design water flow and risk assessment.
Gullies And Gravity Drainage Connections Suitable designed discharge points used where site levels allow water to leave the cavity drain system by gravity. The outlet must remain capable of accepting the anticipated flow without backing up into the system.
Discharge Pipework And Non-Return Components Correctly sized pipework, valves and fittings that carry pumped water from the sump to the approved discharge point while preventing unwanted return flow.
Platinum AquaAlarm 9V And Platinum AquaAlarm Wireless High-water-level alarms used to warn the building user if water rises above the normal operating level in the sump chamber, providing early notice of a pump, discharge or power problem.
Pump Battery Back-Up System Back-up power provision used where the waterproofed area relies on mechanical pumping and the risk assessment requires continued pump operation during a mains failure. Capacity must be selected for the pump load, likely outage duration and expected water ingress.
Platinum AquaAlarm Elite Telemetry Enhanced monitoring and notification option for projects requiring remote warning of high water, power interruption, servicing needs or other defined system conditions.
Newton Condensation Strip Optional edge detail used where a deep floor build-up prevents the perimeter channel from collecting condensation running down the room-facing side of the wall membrane. It maintains a route from the membrane face to the drainage zone.
Preparation And Supporting Products
Product Purpose Within The System
Wykamol Anti-Lime Sealer Concentrated anti-lime treatment for suitable old or new concrete surfaces. It helps reduce free-lime leaching and dust that could otherwise create deposits in the cavity or AquaTrack channels. Apply in accordance with the separate product instructions.
Lignum Pro M50 Masonry Biocide Biocidal surface treatment used after brushing away visible mould or masonry fungal contamination and before the membrane is installed. Dry rot requires a separate detailed assessment rather than simple concealment behind the membrane.
DampSolve Damp Proof DPC Cream Injection cream used where an appropriate above-ground damp-proof course is required to control avoidable moisture movement before CV8 is installed. It is not a substitute for the Type C drainage system below ground.
Platinum Fillet Seal Mortar Rapid-curing, non-shrink cement-based mortar used to make good, re-profile or form suitable fillet details at wall-to-floor and wall-to-wall junctions where required by the preparation or combined waterproofing design. Allow repair work to reach the required condition before covering.
Renderproof Waterproofing Additive Waterproofing and salt-inhibiting additive for suitable sand-and-cement repair mixes used to level or make good backgrounds before installing CV8. All new work must be allowed to dry thoroughly.
Damp Proof Course Membrane Sheet DPC used where waterproofing or damp-proofing continuity is required through an internal wall, reveal or floor junction. The DPC can be linked to CV8 with Platinum Joint Sealing Membrane Tape and over-sealed with Platinum Corner Tape where the design requires it.
Wykamol High Load Closed Cell Insulation High-load insulating drainage spacer for suitable floor build-ups. Its grooved face supports drainage beneath the floor finish while providing thermal insulation and load-bearing support. Use only as part of a compatible specified build-up.
Newton CDM Fibran XPS 500-C 50mm closed-cell XPS thermal spacer with a grooved drainage face and shiplap edges, used in compatible basement floor build-ups requiring insulation, drainage and high compressive resistance.

 

 

Health & Safety And Installer Competency

Platinum CV8 should be installed by competent operatives who understand damp proofing, structural waterproofing and Type C drained protection. The sheet is straightforward to cut and fix, but the finished system depends on correct assessment, preparation, fixing, jointing, drainage, discharge, protection and maintenance access. Platinum CV8 must not be treated as a stand-alone barrier capable of resisting hydrostatic pressure without a functioning drainage route.

A waterproofing design specialist should be involved where required by BS 8102:2022, the complexity of the work, the intended use of the space, building-control requirements or the structural warranty provider. Habitable basements, high water-risk sites, pumped systems, combined waterproofing designs and projects with complex penetrations or level changes require particularly careful coordination.

Follow normal site precautions. Although the membrane itself is not expected to create a specific hazard during normal handling, drilling, cutting, hammering, heat-gun use and work in confined below-ground spaces introduce their own risks. Basements and cellars may have restricted lighting, ventilation, access and escape routes. Complete the appropriate risk assessments, confirm safe access and provide adequate lighting and ventilation before starting.

Wear suitable PPE for the work, which may include gloves, hard hat, eye protection, high-visibility clothing, safety footwear, hearing protection and respiratory protection when drilling dusty masonry. Follow the safety information for every chemical preparation, mortar, biocide, sealer, adhesive and ancillary product used with the membrane.

Before drilling, scan for concealed electrical cables, water pipes, gas services and other hazards. Plan all fixing lines, membrane joints, AquaTrack routes, sump positions, service entries and final finishes in advance. Drill through the centre of the selected membrane stud and control dust so that excessive debris does not fall into the cavity or drainage channel. Use correctly erected access equipment for high walls, vaults and soffits.



System Design Principles

Platinum CV8 is an 8mm-class cavity drain membrane for Type C waterproofing and damp-proofing systems. Type C construction accepts that some water may pass through the retaining structure and manages it on the inside using a cavity, collection channels and a safe discharge. Where gravity drainage is not dependable, the system normally incorporates a sump chamber and one or more pumps.

The internal cavity relieves and controls water rather than attempting to hold it back at the inner face. For this reason, the design must create an uninterrupted route from every potential entry point to the drainage system. The CV8 cavity, wall-to-floor detail, Platinum AquaTrack, any cross-floor channels, outlets, sump chamber, pump and discharge pipework must work as one coordinated arrangement.

Base the waterproofing design on BS 8102:2022, the water-risk assessment, ground conditions, structure, anticipated water pressure, intended use and required internal environment. A Grade 3 environment may be required for habitable below-ground rooms, but Grade 3 performance is a result of the complete system. It depends on appropriate design, workmanship, drainage capacity, pump provision, ventilation, maintenance and protection from later damage.

If drainage channels become blocked, water entry exceeds the design capacity, the gravity outlet backs up, a pump fails or mains power is lost, the waterproofed space may be at risk. Inspection ports, accessible sump covers, high-water alarms, pump redundancy and battery back-up should therefore be considered at design stage rather than added after the installation is concealed.

For below-ground and earth-retaining structures, the designer must also determine whether combined waterproofing protection is necessary. Depending on the risk and warranty requirements, this may combine Type C with a compatible Type A barrier or Type B water-resistant structure. Platinum CV8 can form the internal drained protection element, but the complete specification must be selected and approved for the particular project.



Suitable Substrates

Platinum CV8 can be installed on suitable walls, floors, vaults, tunnels and other structures above or below ground level. Typical backgrounds include concrete, brickwork, blockwork, stone, masonry, sound render and sound screed, provided the construction is stable, capable of accepting the specified fixings and suitable for the intended drainage and finishing build-up.

For new floor construction, concrete bases should be laid in accordance with BS 8204-1:2003+A1:2009. The CV8 technical information calls for a flat surface with no more than 5mm deviation beneath a 3000mm straightedge. Controlled falls, local drainage details and the structural design must also be coordinated with the waterproofing layout.

Assess existing walls and floors before installation. Remove or repair unsound plaster, weak render, defective screed, friable masonry, sharp projections, severe depressions and unstable areas. CV8 generally needs less preparation than a fully bonded tanking product, but the background must still hold the fixings, allow the sheet to lie without damaging stress points and permit water to reach the drainage system without obstruction.

Do not install over unassessed structural movement, active collapse, contaminated surfaces requiring specialist remediation or hazardous materials. Structural cracks, failed joints and active water flows may require engineered repair or water-stopping measures before the Type C system is completed.



Preparation Of Walls, Floors And Soffits

Remove unsound plaster, render and screed, then level or re-profile the substrate where required. Platinum Fillet Seal Mortar or a suitable 3:1 sand-and-cement repair mix incorporating Renderproof Waterproofing Additive may be used for appropriate repairs. Follow the separate product instructions and allow new cementitious work to dry thoroughly before installing the membrane or applying butyl tapes.

Brush away visible mould and masonry fungal contamination, then treat the prepared surface with Wykamol Microtech Masonry Biocide in accordance with its current technical and safety information. If dry rot is present, stop and arrange a detailed assessment of the moisture source, affected timber and adjoining construction. A membrane must not be used to conceal unresolved timber decay.

Above ground level, repair avoidable sources of moisture wherever practical. Check rainwater goods, external ground levels, pointing, render, plumbing, roofs, flashings and other defects. Where rising damp control is appropriate, DampSolve Damp Proof DPC Cream may be installed to the correct specification before CV8. This reduces unnecessary moisture loading and helps protect surrounding masonry and timber.

Treat concrete walls and slabs with Wykamol Anti-Lime Sealer where new concrete, free lime, efflorescence or dusting could affect the cavity drain system. Lime carried by water can harden within drainage routes and increase maintenance or blockage risk. Prepare, dilute, apply and cure Anti-Lime Sealer strictly in accordance with its own instructions; do not apply it to pooled water or unsuitable surfaces.

Clean the final background and remove loose debris before closing the cavity. Pay particular attention to the wall-to-floor junction, channel troughs, sumps and access details. Construction debris left behind the membrane can restrict drainage, contaminate the channel or make later flushing more difficult.


Platinum CV8 Cavity Drain Waterproof Membrane (8mm Stud) - Basement Waterproof Membranes

Anti-lime sealer being applied to prepared concrete before installation of Platinum CV8 Waterproof Membrane.

 


Tools And Ancillary Products Required

Typical installation tools include an SDS Plus hammer drill, the included 10mm x 160mm masonry bit, spare or alternative-length 10mm bits where required, a rubber mallet or club hammer, sharp utility knife with spare blades, tape measure, long level, straightedge, marker, clean rags, soft roller or firm hand-pressure tool for tapes, and a suitable vacuum or dust-control arrangement. A laser level is useful for long runs, plug lines, channel setting-out and floor levels. Provide suitable task lighting and access equipment for basements, high walls and vaults.

A controlled hot-air gun may be useful for removing light surface moisture and improving butyl-tape adhesion in cold conditions, but it must not overheat, melt or distort the HDPE membrane. Open flames must never be used. All surfaces receiving tape or rope must be clean, dry and free from dust, grease, condensation and loose material.

The kit supplies the stated quantity of Platinum Waterseal Brick Plugs and Joint Sealing Membrane Tape. The complete system may also require extra plugs or tape, Platinum Waterseal Rope, Platinum Corner Tape, suitable patching materials, AquaTrack perimeter and floor channels, the required AquaTrack connectors and outlets, inspection or in-line access ports, and a correctly selected gravity outlet or AquaSump system. Where pumping is essential, also provide the specified discharge components, high-water alarm and any required secondary pump, back-up power or telemetry.

Do not assume that selecting a kit means every project component is present. Do not begin fixing the membrane until the kit contents have been checked, all additional critical products are available and the installation sequence has been agreed. Leaving unfinished joints, missing drainage connections or inaccessible temporary details increases the chance of contamination and damage before the system is closed.



Drainage Requirements

Platinum CV8 must form part of a drainage-based waterproofing system. The cavity behind the membrane requires a clear and maintainable route to a safe discharge; without it, water can accumulate and the system cannot perform as intended. Platinum AquaTrack Drainage Channel is installed at the vulnerable wall-to-floor junction to collect water from behind the wall membrane. Platinum AquaTrack Floor Drain Channel can provide cross-floor connections, threshold drainage or a route to a centrally positioned sump.

Set out channel routes and levels before installing the membrane. Confirm the proposed trough, wall-membrane termination, floor-membrane link, sumps and outlets with the waterproofing design. AquaTrack Connector Pieces join straight channel lengths; Swept Corner Pieces form direction changes; T-Pieces join three routes or connect perimeter channel to Floor Drain; and Universal End Caps either terminate a run or provide a reduced pipe outlet where the designed detail permits.

Use the AquaTrack 110mm Drainage Channel Outlet where channels must connect to a standard 110mm pipe. Use the AquaTrack 90° In-Line Drainage Connector where a level change requires connection from the underside of the channel into suitable 40mm pipe. These are design components rather than interchangeable accessories, so choose the outlet by pipe size, flow requirement, sump arrangement and available levels.

Maintenance access is essential. Install AquaTrack Inspection Ports at compatible Swept Corner and T-Piece push-outs, including changes of direction, and use AquaTrack In-Line Access Ports where longer straight runs require additional access. Position every port so it remains reachable after screed, flooring, dry lining and skirting are installed. Never conceal a maintenance point permanently behind a fixed finish.

Where gravity drainage is unavailable, connect the channel system to a correctly sized Platinum AquaSump. Select pumps for the expected flow, vertical head, pipe resistance and discharge distance. The waterproofing designer should consider pump redundancy, non-return valves, high-water alarms, power failure, battery back-up and the consequences of pump downtime. Route discharge water to a lawful, suitable point where it cannot return towards the structure.

Before covering the system, flush or water-test the channels and confirm free flow to the outlet or sump. Check connectors, corners, access ports and sump entries for debris or displacement. Test pumps, floats, alarms and any back-up or telemetry equipment in accordance with their instructions.



AquaTrack Channel Preparation And Installation

Coordinate the AquaTrack layout with the waterproofing drawings before breaking out the floor. Each standard perimeter channel section is 2m long, approximately 80mm wide and 50mm high with an additional 60mm upstand. The current AquaTrack installation information describes a perimeter trough approximately 130mm wide x 130mm deep, but the final excavation must suit the structure, levels, channel connections, reinforcement, services and project design.

Install the wall membrane first and take it down into the drainage zone. The AquaTrack guidance calls for the cavity drain membrane to extend at least 100mm below the existing floor level so water from the wall cavity can reach the channel. Keep the membrane face and trough free from masonry fragments, drilling dust and hardened mortar.

Place a shallow, stable bed of clean 20mm stone in the prepared trough. Set the AquaTrack channel on the stone with the upstand uppermost and the flat side held against the waterproofed wall. Check level and continuity as the work proceeds. Join straight lengths with AquaTrack Connector Pieces and install the specified Swept Corners, T-Pieces, End Caps, outlets and access ports at the planned locations.

Use AquaTrack Floor Drain Channel without an upstand where the design needs a cross-floor connection or a low-profile threshold detail. Connect it to perimeter AquaTrack with the purpose-made T-Piece and route it to the sump or outlet without local backfalls. Use the 110mm outlet, 90° In-Line Connector or Universal End Cap outlet only with the compatible pipe size and connection arrangement described for that component.

After the channel is connected, backfill the remaining trough space with clean 20mm stone and finish it level with the top of the channel. Where a floor membrane is included, carry it over the stone-filled zone and seal it to the wall-membrane detail with the specified Joint Sealing Membrane Tape and Corner Tape arrangement while preserving the intended water entry into AquaTrack. Where no floor membrane is used, the AquaTrack guidance describes a 50mm screed finish over the perimeter detail, subject to the approved waterproofing and floor design.

Keep every Inspection Port and In-Line Access Port visible and removable after the floor and wall finishes are complete. Flush the installed channel before concealment, observe the water at the sump or gravity outlet, and rectify any obstruction, backfall, open connector or displaced component before proceeding.


Platinum CV8 Cavity Drain Waterproof Membrane (8mm Stud) - Basement Waterproof Membranes

AquaTrack Drainage Channel being installed at the wall-floor junction with Platinum CV8 Membrane, helping manage water ingress within a Type C basement waterproofing system.

 


Wall Installation

Install Platinum CV8 with the studs facing the wall. The studded profile must sit against the substrate so that it creates the drainage cavity behind the smooth room-facing surface. Plan the sheet orientation, flange positions, joint direction, fixing lines, wall-to-floor termination and final lining before cutting or drilling.

Offer the first sheet to the wall and align it accurately. CV8 may be installed vertically or horizontally where the system design and site handling permit, but all overlaps must shed water towards the cavity and must not leave an unsealed edge capable of directing water into the internal finish. Keep the sheet tight to corners and prevent unnecessary bridging, tension or creasing.

Drill through the centre of a membrane stud into sound substrate using the bit size required for the Platinum Waterseal Brick Plug. Make the hole deep and clean enough for the plug to seat fully. Control drilling dust so it does not accumulate behind the membrane or enter AquaTrack.

Insert the plug and drive it home with a rubber mallet or club hammer until the soft sealing washer is evenly compressed against the membrane. The washer must sit flat and must not be split, folded or displaced. Where a separate butyl fixing seal is specified because the washer is omitted or cannot seat correctly, form a complete compressed seal around the plug neck with Platinum Waterseal Rope.

For standard wall areas, space plug fixings no more than 600mm apart unless the project design, substrate, board dimensions or finishing system requires closer centres. Increase restraint where necessary at sheet edges, corners, openings and irregular areas. Align fixing rows with planned battens or support components so later trades can use the plug heads instead of creating new penetrations.


Platinum CV8 Cavity Drain Waterproof Membrane (8mm Stud) - Basement Waterproof Membranes

Platinum CV8 Membrane installed on basement walls, with sealed joints and brick plug fixings creating a controlled cavity to manage moisture and direct water towards the drainage system.



Wall Fixing Centres And Internal Finishes

Choose fixing centres to suit the selected internal finish. For a battened or stud-framed lining, install Waterseal Plugs in vertical rows roughly corresponding with the support positions. Timber battens should be at least 25mm x 38mm where following the source installation arrangement. Fix suitable battens or brackets into the plug cores with 5mm No.10 screws of a controlled length that cannot pass through the plug and puncture the membrane.

If substrate condition prevents plug heads from following a straight support line, compatible dry-lining brackets may be used to align the battens. The bracket and screw arrangement must use the existing sealed plug positions and must not introduce uncontrolled membrane penetrations.

On reasonably flat walls, the serrated heads of Platinum Waterseal Brick Plugs may provide fixing points for a compatible dot-and-dab board system where the project specification permits it. Apply the board adhesive to the plug heads rather than directly to the unsupported membrane. If following the source dry-lining arrangement, conventional bonding plaster is applied in dabs at least 8mm thick and covering at least 50% of the membrane area. Confirm adhesive, board, fire and moisture compatibility for the particular project before use.

Platinum CV8 is a non-meshed membrane and is not intended to receive direct plaster or render. Where a direct wet-plaster or render finish is required, specify a suitable meshed cavity drain membrane instead. CV8 should be protected by a compatible dry-lining system, independent frame, battened board finish, permitted dot-and-dab lining, blockwork lining or other designed finish that does not puncture or overload the waterproofing layer.




Jointing And Sealing

Use the flange along the edge of the CV8 sheet to form the principal overlap wherever possible. The flange is the flat band without studs. Place Platinum Joint Sealing Membrane Tape inside the overlap, align the adjoining sheet and compress the complete joint firmly so that the butyl tape makes uninterrupted contact with both membrane surfaces.

On vertical wall runs, arrange the flanges vertically and place each new sheet in front of the preceding sheet so water is directed into the drainage cavity rather than towards an open edge. At a horizontal joint, position the lower sheet in front of the upper sheet. Plan the sequence before fixing because reversing a lap can create a ledge that traps debris or directs water towards the room-facing side.

Both surfaces must be clean, dry and free from dust, grease and condensation before applying tape or rope. Wipe the membrane with clean rags and allow it to dry. In a cold or damp environment, a hot-air gun may be used cautiously to remove surface moisture and gently warm the jointing area, but the HDPE must not be overheated, softened or distorted. Open flames must not be used.

For a non-flanged or irregular stud-to-stud joint, form the specified seal with Platinum Waterseal Rope, shaped and compressed into the profile so no route remains through the joint. Platinum Joint Sealing Membrane Tape may also be used in compatible stud-interlock details where it can be fully compressed between clean mating surfaces.

Where severe water ingress is present or reasonably foreseeable, add a wider face seal with Platinum Corner Tape if required by the design. Corner Tape is also useful at wall-to-floor transitions, patches, protrusions and awkward junctions. It does not remove the need for a correctly formed primary overlap beneath it.

Seal mitres, shaped cuts, columns, vault sections, pipe details and three-dimensional junctions with the appropriate combination of Joint Sealing Membrane Tape, Waterseal Rope, Corner Tape, membrane patches and compatible collars or sleeves. Platinum Mesh Tape may provide additional finishing or reinforcement support where specified, but it must not be relied upon as the sole waterproof seal.

Roll or press every joint along its full length. Inspect for fish-mouths, bridged sections, trapped dust, stretched membrane and insufficient compression before the next sheet or finish hides the detail.



Wall-To-Floor Junction And AquaTrack Integration

The wall-to-floor junction is commonly one of the highest-risk points in a basement and must be detailed as part of the drainage design. Terminate the wall membrane so water from the cavity can enter Platinum AquaTrack Drainage Channel without passing into the internal floor build-up. Keep the channel inlet zone clear and do not seal the membrane in a way that blocks the intended water path.

Where the AquaTrack product installation arrangement is being followed, form the specified trough at the perimeter, prepare a stable 20mm stone bed, and position the channel with its flat side against the waterproofed wall and the upstand correctly oriented. The exact trough size, channel level and membrane termination must follow the project drawings and current AquaTrack instructions rather than a generic site assumption.

Connect straight channel sections with AquaTrack Connector Pieces and use purpose-made Swept Corners, T-Pieces, End Caps, outlets and access ports rather than improvised cuts. Provide Inspection Ports at direction changes and additional In-Line Access Ports where required. Complete and test the drainage route before laying floor membrane, screed or other permanent finishes.

Where a floor membrane is included, link it continuously to the wall membrane and drainage detail using the specified overlap, Platinum Joint Sealing Membrane Tape and Platinum Corner Tape. The junction must both preserve waterproofing continuity and allow water from the wall cavity to enter AquaTrack; do not create a sealed pocket above or behind the channel.



Floor Installation

Before laying Platinum CV8 on a floor, ensure the slab or screed is clean, stable, reasonably dry at the surface and free from oil, loose material, sharp projections and debris. Repair holes, ridges and severe depressions. New concrete bases should meet the specified flatness requirement of no more than 5mm deviation beneath a 3000mm straightedge, and any designed falls must lead water towards the drainage arrangement rather than create isolated low points.

Apply Wykamol Anti-Lime Sealer to suitable concrete where required to control free-lime leaching and dust. Allow all levelling, repair and anti-lime treatments to reach the condition stated in their individual instructions before closing the floor cavity.

Roll out the membrane with the studs facing down towards the floor so the studded profile creates a drainage space beneath the smooth upper face. Cut with a sharp blade and fit neatly around walls, columns, sumps, drainage channels and unavoidable service details. Avoid excessive small pieces and unnecessary seams.

Lay the next sheet so its flange overlaps the preceding sheet. Apply Platinum Joint Sealing Membrane Tape to clean, dry surfaces inside the overlap and compress the joint firmly along its full length. Where no flange is available, use the designed combination of Waterseal Rope, Joint Sealing Tape, Corner Tape and a membrane patch to create a continuous seal.

Connect the floor membrane to AquaTrack, wall membrane, DPC details, sump entries and other terminations in accordance with the system design. Use Platinum Corner Tape where a broad face-applied seal is required. Check that the completed edge detail does not obstruct water entering the channel from the wall or floor cavity.

If the final floor build-up is too deep for AquaTrack to collect condensation from the room-facing side of the wall membrane, a Newton Condensation Strip may be included as a separate edge route. This deals with surface condensation only; it does not replace cavity drainage behind the membrane.

For a floating floor, CV8 may be overlaid with compatible closed-cell insulation before tongue-and-groove flooring is installed. Maintain a 10mm expansion gap around the perimeter unless the flooring or system design requires otherwise. Alternatively, a conventional sand-and-cement screed approximately 65mm thick may be laid over the membrane where structurally and technically suitable.

Where a high-load insulating drainage layer is needed, specify Wykamol High Load Closed Cell Insulation or Newton CDM Fibran XPS 500-C as part of a compatible build-up. These 50mm-class thermal spacers use a grooved face to preserve drainage and shiplap edges to reduce the risk of screed entering open joints. Follow the board orientation, loading, edge, joint and floor-finish requirements for the chosen product.

Protect the membrane throughout floor work. Use load-spreading boards where necessary, keep reinforcement, tools and sharp offcuts away from the sheet, and prevent screed or adhesive entering drainage cavities or access ports. During relevant wet finishing work, keep atmospheric relative humidity below the limit stated in the technical instructions; the source membrane information specifies below 70% RH during application. Do not install impermeable floor coverings until the screed is dry enough, with the source information requiring screed moisture below 75% RH.



Vaulted Soffit Installation

Platinum CV8 can line vaulted ceilings, arches and sloping underground structures when the membrane can be fixed tightly to the substrate and water can drain continuously to the designed collection point. Survey and set out the vault before cutting. Plan sheet sizes, joint direction, end-wall transitions, fixing density and access so the membrane follows the curve without bridging, excessive tension, deep creasing or sagging.

Measure and cut each section accurately, then hold the studs against the vault while drilling through the centre of selected studs into sound substrate. Use enough fixings to keep the sheet firmly supported over the complete curved surface. Standard Waterseal Plug washers may be used where they sit flat and compress evenly. On details where the washer is deliberately omitted or cannot seat reliably, form a complete seal around the plug neck with Platinum Waterseal Rope in accordance with the specified detail.

Keep cuts to the minimum required. Seal flanged laps with Platinum Joint Sealing Membrane Tape and use Waterseal Rope, Corner Tape, patches and compatible reinforcement at mitres, curved joints, returns and end-wall junctions. Every cut edge and penetration must be inspected before the lining is concealed.

The drainage cavity must remain continuous from the crown and sides of the vault to AquaTrack or another designed collection route. Do not permit the sheet to sag between fixings because low pockets can retain water, sediment and biological debris. Vault work should be undertaken from suitable access equipment by installers able to see and compress every overhead joint safely.



Typical vaulted soffit installation showing Platinum CV8 Waterproof Membrane fixed to a curved vault, with sealed joints, drainage detail and Platinum AquaTrack channel integration.


 

Flat Soffit Restrictions

Do not line a flat below-ground soffit with Platinum CV8 unless it has a reliable minimum slope of 10% towards the designed drainage route. A flat or inadequately sloping overhead surface can allow water to pond behind the membrane, load the fixings, contaminate the cavity and place stress on joints and terminations.

If the soffit does not provide the necessary fall, specify another waterproofing approach. CV8 is better suited to vaulted, arched or sloping overhead construction where gravity can move water to the collection point. Even on a compliant slope, the membrane must remain tight to the substrate and must not sag.



Door Reveals, Corners And Junction Details

Form internal and external corners so the CV8 sheet sits tightly into the angle and provides a well-defined edge for the subsequent lining. Do not bridge across a corner and leave a rounded, unsupported void. Use correctly located Waterseal Plugs to hold the membrane into the angle without overstressing or tearing a stud.

Where the sheet can be folded cleanly, retain the continuous sheet and secure it. Where cutting is necessary, keep the cut controlled and seal the resulting joint with Joint Sealing Membrane Tape, Waterseal Rope, Corner Tape or a purpose-cut patch as required by the geometry. Avoid building several bulky tape layers into a corner unless the detail has space to compress them correctly.

Treat door and window reveals, columns, returns, steps and openings as complete waterproofing details rather than simple trimming points. Lap, wrap or patch the membrane so the drainage cavity remains continuous and all exposed edges are sealed. Coordinate the final lining, frame fixings and threshold before closing the detail; later drilling through a finished reveal is a common route for accidental damage.

Where a sheet DPC passes through an internal wall or reveal, connect it to CV8 with Platinum Joint Sealing Membrane Tape and add Platinum Corner Tape where a wider face seal is required. Maintain continuity with any above-ground damp-proofing arrangement without blocking the Type C drainage route below ground.



Protrusions Through Platinum CV8

Avoid passing pipes, cables, ducts and conduits through Platinum CV8 wherever practical. Each penetration is a potential weakness and must be included on the waterproofing drawings. Re-route services on the room side of the lining or through a planned service zone where possible.

If a penetration is unavoidable, cut the smallest neat opening that permits the service to pass without tearing the membrane. Pack and compress Platinum Waterseal Rope around the service to form a continuous butyl seal. Cover the detail with Platinum Corner Tape or a membrane patch where a broader seal is needed. A compatible pipe collar or sleeve should be fully sealed to both the membrane and the service material.

Allow for pipe movement, vibration, thermal expansion and future maintenance. A rigid tape patch applied over a moving or contaminated pipe may fail even when it initially appears sealed. Clean and prepare plastics, metals and coated services in accordance with the sealing accessory instructions, and use a proprietary collar where simple rope-and-tape detailing cannot accommodate movement.

Floor penetrations require particular care because water can bypass the membrane and enter the finished floor build-up. Use Waterseal Rope, Joint Sealing Membrane Tape and a purpose-cut CV8 or DPC patch as required. Seal the full patch perimeter, inspect it from every side and, where practical, test it before installing insulation, screed or flooring.



Protection Of Platinum CV8 After Installation

Protect CV8 immediately after installation. On walls, protection may be provided by an independent lining, framed dry lining, correctly fixed battens and boards, an approved dot-and-dab system, blockwork or another specified finish. On floors, use compatible closed-cell insulation with tongue-and-groove flooring, an adequately designed screed or another load-spreading build-up that will not puncture the sheet.

Tell every follow-on trade that the waterproof membrane must not be drilled, nailed or screwed through. Use the existing Waterseal Plug cores for approved secondary fixings and select screw lengths that cannot reach beyond the plug. Mark no-fix zones at channels, sumps, pipework and complex details before covering the membrane.

Keep sharp tools, board corners, reinforcement, rubble, heavy point loads and uncontrolled site traffic away from unprotected CV8. Do not drag materials across floor membrane. If temporary protection is removed, reinspect the exposed area before installing the permanent finish.

Protect stored and installed membrane from prolonged direct sunlight, high temperatures and open flame. CV8 is intended to remain protected within the building build-up rather than exposed as a finished surface.



Ventilation And Humidity Control

Platinum CV8 manages water and moisture entering through the structure; it does not remove water vapour generated inside the finished room. Cooking, showering, drying clothes, occupation and inadequate heating can still produce condensation on cold surfaces even when the Type C system is functioning correctly.

Provide an appropriate ventilation, heating and humidity-control strategy for the intended use. Mechanical extract or whole-room ventilation is especially important in bathrooms, kitchens, utility rooms and other high-moisture areas below ground. The ventilation design must comply with the wider building specification and should remain maintainable after occupation.

Do not diagnose condensation as membrane failure without checking humidity, surface temperatures and ventilation, but equally do not assume visible water is condensation until drainage, pumps, joints and penetrations have been inspected. The two sources require different remedial actions.

Where condensation can run down the room-facing surface of the wall membrane and the floor build-up prevents it reaching AquaTrack, consider Newton Condensation Strip as part of the designed edge detail. Keep its route clear and do not bridge it with sealant, plaster, screed or skirting adhesive.



Inspection Before Finishes

Inspect the complete CV8 installation before it is covered. Check the membrane for punctures, cuts, tears, crushed studs, sagging, loose plugs, distorted washers, poorly compressed joints, bridged corners and unsealed penetrations. Confirm that each repair is complete before boards, battens, insulation, screed or flooring make the area inaccessible.

Check every Joint Sealing Membrane Tape overlap for continuous contact. Confirm that Waterseal Rope remains correctly positioned and compressed, and that Corner Tape is fully bonded beyond the edge of each repair or junction. Pay particular attention to the base of walls, door openings, columns, external corners, pipe clusters and vault end details.

Inspect the water-management system separately. Confirm AquaTrack channel position and level; straight connectors; Swept Corners; T-Pieces; End Caps; 110mm or 40mm outlets; Floor Drain links; sump entries; and all Inspection and In-Line Access Ports. Remove debris and verify that each access point remains reachable after the proposed finish is installed.

Flush or water-test the drainage route in accordance with the design. Test all pumps, floats, non-return valves, alarms, battery back-up and telemetry. Confirm the discharge point accepts the flow and does not return water towards the building. Record the inspection and retain photographs of critical details before concealment.



Repairs To Platinum CV8

If a fixing hole is drilled through the wrong stud, clean and dry the area, fill the penetration with Platinum Waterseal Rope and over-seal it with Platinum Corner Tape. Extend the face tape well beyond the damaged point and press it firmly to the prepared membrane. Install the replacement Waterseal Plug through a different stud into sound substrate.

For a small cut or puncture, flatten the damaged area without enlarging it, then bridge it with Corner Tape on clean, dry membrane. The tape must extend beyond the defect on every side and remain fully supported. Remove loose fragments that would prevent adhesion, but do not pull a tear wider.

For a larger hole, cut a CV8 patch with a generous sound margin around the damage. Where the studs interlock neatly, seal the patch perimeter with Platinum Joint Sealing Membrane Tape inside the overlap. Where the profile cannot form a reliable interlock, use Platinum Corner Tape around the complete face perimeter, adding Waterseal Rope beneath irregular sections where required.

Take extra care with floor and vault repairs because these areas may see greater water movement or mechanical loading. A repair that cannot be fully accessed, supported, compressed and inspected should be removed and replaced with a larger membrane section rather than concealed as a doubtful patch.



Maintenance And Future Alterations

Platinum CV8 itself requires little routine attention after it is protected, but the drainage and pumping system must remain accessible and serviceable. Maintain AquaTrack channels, Floor Drain, outlets, access ports, sump chambers, pumps, valves, alarms and discharge pipework in accordance with the waterproofing design and each component manufacturer's instructions.

The AquaTrack product information recommends regular channel cleaning and describes a six-monthly cleaning interval. The actual maintenance plan should reflect the water risk, lime and sediment exposure, pump duty, occupancy and warranty requirements. High-risk or heavily used systems may require more frequent inspection.

Use AquaTrack Inspection Ports at corners and T-Pieces and AquaTrack In-Line Access Ports on straight runs to inspect and flush the system. Keep covers visible or clearly documented and removable. Clean silt and debris from the sump, operate each pump, test floats and non-return valves, check the discharge and confirm every alarm and back-up device works.

Where the waterproofed space relies on pumping, arrange competent servicing and maintain an emergency response plan. Consider a secondary pump, high-water alarm, battery back-up and telemetry where the consequence of failure justifies them. Replace batteries and worn pump components at the intervals specified for the installed equipment.

Control future alterations. Shelving, kitchens, sanitary fittings, skirting, cupboards, floor fixings, new services and later refurbishment must not penetrate CV8 or obstruct AquaTrack without a reviewed waterproofing detail. Provide the owner with drawings, photographs, operating instructions, maintenance schedules and the location of no-fix zones and access points.



Key Limitations

  • Platinum CV8 is one component of a Type C cavity drain system. It must not be relied on as a stand-alone barrier against hydrostatic pressure.

  • Water behind or below the membrane must have a continuous route to AquaTrack, a suitable gravity outlet or a correctly selected sump-and-pump arrangement.

  • The membrane alone does not guarantee a Grade 3 environment. The complete structure, waterproofing design, drainage, pumps, details, finishes, ventilation and maintenance determine the internal result.

  • Kit size describes the nominal gross area of the membrane roll, not guaranteed installed coverage. Allow for overlaps, trimming, corners, junctions, penetrations, repairs and reasonable waste.

  • The included plug, tape and drill-bit quantities are the stated kit contents, not a substitute for a project take-off. Order supplementary components wherever fixing centres, joint lengths, substrate hardness or detailing demand exceeds those quantities.

  • Do not use CV8 on a flat below-ground soffit unless the soffit provides a minimum 10% slope to drainage. Prevent sagging on all overhead applications.

  • CV8 is non-meshed and must not receive direct plaster or render. Use a compatible dry lining or specify a suitable meshed membrane for a direct wet finish.

  • Seal below-ground fixing points with the supplied Waterseal Plug washers or with a correctly compressed Waterseal Rope detail where the washer is omitted by design.

  • Keep tapes and rope clean and dry during installation. Butyl seals will not perform reliably over dust, grease, standing water, condensation or loose material.

  • Do not allow later screws, nails, brackets, services or floor fixings to puncture the membrane. Repair all accidental damage before concealment.

  • Protect the membrane from prolonged UV exposure, sharp objects, high temperatures and open flames.

  • Cavity drain performance depends on inspection and maintenance. Do not conceal AquaTrack access ports, sump covers, alarms or serviceable components.

  • Seek specialist design advice for habitable basements, high water-risk sites, complex structures, combined waterproofing, pumped systems, structural movement or warranty-controlled work.



Storage And Shelf Life

Store Platinum CV8 rolls upright, under cover, on a stable surface and away from prolonged sunlight, high temperatures, ignition sources and open flames. Protect the roll edges and flanges from crushing, contamination and distortion. Do not stack or handle rolls in a way that damages the stud profile.

The stated life expectancy is equivalent to the lifetime of the structure when the membrane is stored and installed in accordance with the technical recommendations. This is an in-service durability statement, not permission to leave rolls exposed indefinitely before installation. Inspect stored material before use and reject sections with heat damage, brittleness, severe distortion, contamination or compromised edges.

Keep Joint Sealing Membrane Tape in its original packaging in clean, dry conditions and protect the butyl faces from dust, moisture, heat and deformation. Keep Waterseal Plug washers clean, flat and undamaged. Store drill bits dry and inspect the cutting head and SDS shank before use. The kit has no single combined shelf-life statement; follow the current storage and service information for each supplied component.



Other Technical Information

Platinum CV8 is manufactured from clear HDPE. The published technical information lists a unit weight of 0.5kg/m², sheet thickness of 0.45mm and stud height of 7mm. The product is described commercially as an 8mm-class or nominal 8mm studded membrane. It passes water-tightness testing at 60kPa for 24 hours to EN 1928.

Published tensile strength is 416N in the machine direction and 488N in the cross direction to BS 12311-2. Resistance to static loading is greater than 20kg to BS 12730. Compressive strength is listed as 180kN/m² in the main technical data to BS EN ISO 25619-2, while the essential-characteristics table reproduces the source declaration format of 180kN.

The listed working temperature range is -50°C to +80°C and the softening temperature is 126°C. Reaction to fire is Class E to BS EN 13501-1, application type is Type V, and life expectancy is stated as the lifetime of the structure when stored and installed in line with the recommendations.

Platinum CV8 can contribute to a Type C system designed under BS 8102:2022, but every project must be assessed as a complete waterproofing arrangement. Product data does not replace a site-specific design, and references to a standard do not constitute third-party product certification.

The 10m² kit contains a 2m x 5m membrane roll, 30 Waterseal Brick Plugs, one 30mm x 15m roll of Joint Sealing Membrane Tape and one 10mm x 160mm SDS Plus bit. The 20m² kit contains a 2m x 10m roll, 50 plugs, one 30mm x 15m tape roll and one bit. The 40m² kit contains a 2m x 20m roll, 100 plugs, one 30mm x 30m tape roll and two bits. These are supply quantities; actual installed coverage and ancillary consumption depend on the project layout and specification.

Q) What is the Platinum CV8 Basement Tanking Membrane Kit?

A) The Platinum CV8 Basement Tanking Membrane Kit is a packaged cavity-drain waterproofing solution intended mainly for below-ground structures. Its principal component is a clear, studded high-density polyethylene membrane that creates a controlled space between the building substrate and the new internal finish. Moisture entering through the wall can move within this cavity towards an appropriate drainage point instead of reaching the finished room. The kit also supplies sealing tape, waterproof brick plugs and a compatible SDS drill bit, helping installers obtain the core items together. It is suitable for projects such as basement conversions, cellars, vaults and tunnels, although drainage components and other detailing materials may still be required.

 

Q) What is included in each Platinum CV8 Basement Tanking Membrane Kit?

A) Every kit contains a roll of Platinum CV8 cavity-drain membrane, Platinum Waterseal Tape, Platinum Waterseal Brick Plugs and a 10mm by 160mm SDS drill bit. The quantities vary with the selected coverage. The 10m² kit contains a 2m by 5m membrane, 30 plugs and one 15m tape roll. The 20m² version contains a 2m by 10m membrane, 50 plugs and one 15m tape roll. The 40m² option contains a 2m by 20m membrane, 100 plugs, one 30m tape roll and two drill bits. Buyers should calculate joints, corners, wastage and fixing requirements before selecting a kit.

 

Q) How does the Platinum CV8 Basement Tanking Membrane Kit work?

A) Platinum CV8 uses an 8mm-class studded profile to hold the membrane away from the wall or floor, creating a cavity behind or beneath the sheet. Water that penetrates the structure is controlled within this space and directed towards a drainage channel, gravity outlet or sump-and-pump system. The room-facing surface isolates the new lining from damp masonry, groundwater and salts. This is a drained-protection approach, commonly called Type C waterproofing. It does not depend on the membrane bonding continuously to the substrate. Effective performance nevertheless requires sealed joints and fixings, an unobstructed drainage route, sufficient discharge capacity and access for maintenance; the membrane should not simply be fitted over a wet surface without planned drainage.

 

Q) Is this kit a complete basement waterproofing system?

A) The kit provides the principal membrane-fixing and lap-sealing components, but it should not automatically be regarded as everything required for a complete basement waterproofing system. A functioning Type C installation normally also needs a designed collection and discharge route, which may include Platinum AquaTrack channels, inspection ports, connectors, an outlet, an AquaSump and one or more pumps. Corners, floor-to-wall junctions, penetrations or stud-to-stud joints may require Waterseal Rope, Corner Tape or additional patches. Floor finishes, wall linings, ventilation and condensation control are separate considerations. The exact specification depends on groundwater risk, structural form, room use and required internal environment, so complex or habitable projects merit specialist waterproofing design.

 

Q) What kit sizes are available, and how do I choose one?

A) Platinum CV8 Basement Tanking Membrane Kits are offered in nominal 10m², 20m² and 40m² sizes. Measure the actual wall and floor surfaces to be covered, including reveals, returns, columns, steps and other irregular areas. Do not select a kit solely from the room’s floor area because a basement’s wall area can be much greater. Add a sensible allowance for cutting, laps, changes of direction, detailing and accidental damage. Also compare the supplied quantities of plugs and tape with the proposed fixing pattern and total joint length; an unusually complex layout may need extra accessories. For multi-room or large commercial work, a drawn membrane layout and materials schedule will produce a more reliable quantity than an approximate measurement.

 

Q) What type of waterproofing is Platinum CV8?

A) Platinum CV8 is intended for Type C drained-protection waterproofing. Rather than attempting to stop all water at the external face or bond a tanking layer tightly to the internal substrate, Type C construction accepts that water may enter the structure and then manages it within a cavity. The membrane separates this water from the occupied space and guides it to a suitable drainage system. The product page refers to BS 8102:2009, but [BSI lists BS 8102:2022](https://knowledge.bsigroup.com/products/protection-of-below-ground-structures-against-water-ingress-code-of-practice) as the current code of practice for protecting below-ground structures against water ingress. Consequently, contemporary projects should be assessed and designed against the current edition, together with applicable building-control, warranty and manufacturer requirements.

 

Q) What are the main advantages of buying the CV8 membrane as a kit?

A) Buying Platinum CV8 as a kit brings together compatible core components and reduces the risk of overlooking basic fixing or lap-sealing materials. The supplied waterproof brick plugs are designed to secure the wall membrane, while the double-sided Waterseal Tape seals overlapping flanged edges. A correctly sized SDS bit is also included, avoiding uncertainty about the drilling diameter. The clear membrane is easy to position and cut, requires relatively limited preparation on sound substrates and has no curing period of its own. Different coverage options suit smaller and larger projects. However, the convenience of a kit should not replace design work: drainage, sumps, junction accessories, finishing materials and any additional fixings must still be specified separately where required.

 

Q) Where can the Platinum CV8 Basement Tanking Membrane Kit be used?

A) The kit is intended primarily for below-ground environments where dampness or water ingress must be controlled. Typical settings include domestic basements, cellar conversions, commercial substructures, underground storage areas, vaults and tunnels. The membrane may be installed on suitable walls and floors and can be used in both refurbishment and new-build work. It is particularly useful where the background is damp, salt affected or unsuitable for dependable adhesion of a bonded coating. Each site still needs an assessment of water-table conditions, drainage, structural stability and intended occupancy. The product should not be treated as a universal solution for every damp problem, especially where condensation, leaking plumbing, defective rainwater goods or structural faults are the principal cause.

 

Q) Is Platinum CV8 suitable for creating a habitable basement?

A) Platinum CV8 can form an important part of a system intended to keep a converted basement dry enough for living, working or similar use. By isolating internal finishes from the damp structure and directing water to drainage, it supports the creation of a controlled internal environment. The membrane alone does not make a basement habitable or guarantee a particular environmental grade. A habitable conversion also requires appropriate insulation, ventilation, heating, floor construction, fire precautions, means of escape, electrical design and compliance with building regulations. Pump redundancy, alarms and backup power may be appropriate where failure would cause serious damage. A waterproofing-design specialist should assess higher-risk schemes and coordinate the membrane with the structure, drainage and final room specification.

 

Q) Can the kit be used on both basement walls and floors?

A) Platinum CV8 can be applied to walls and floors, although the installation and finishing arrangements differ. On a wall, the studs face the substrate and the sheet is mechanically secured using sealed Waterseal Brick Plugs at the specified spacing. On a floor, the membrane is normally loose-laid with the studs down over a clean, stable and sufficiently level base. Floor sheets must be sealed to each other and integrated continuously with the wall membrane and drainage route. The floor then needs a suitable load-spreading build-up, such as closed-cell insulation and tongue-and-groove flooring or an appropriately specified screed. The kit’s plug quantity is principally relevant to wall fixing, so mixed wall-and-floor projects should be measured and detailed carefully.

 

Q) Which substrates are suitable for the Platinum CV8 membrane?

A) The product is suitable for sound concrete, brick, stone and comparable masonry backgrounds commonly found below ground. Existing render, plaster or screed may remain only where it is stable, suitably level and incapable of damaging the membrane; loose or defective material should be removed. The surface must be clean and free from sharp projections, rubble and contaminants that could puncture the sheet or obstruct drainage. For new floors, the product guidance calls for a slab laid to the relevant screed standard, with no more than 5mm deviation beneath a 3,000mm straightedge. Severe hollows, damaged joints and unstable masonry require repair first. Structural movement, active cracking or failing construction should be professionally assessed rather than concealed behind the membrane.

 

Q) How should I prepare a basement before installing the kit?

A) Begin by establishing the source and severity of moisture, checking the structure and confirming where collected water will discharge. Remove loose plaster, weak render, defective screed, sharp projections, dirt and rubble. Repair significant holes or irregularities so the membrane can sit securely without bridging or being punctured. Brush away mould or masonry fungal growth and apply a suitable biocide in accordance with its instructions. Suspected dry rot requires specialist assessment rather than simple concealment. Concrete walls and slabs may need an anti-lime treatment to reduce free-lime deposits that could block drainage. Leaks, defective gutters, high external ground levels and other avoidable moisture sources should be corrected where practical, even though the membrane will manage residual structural water ingress.

 

Q) How is Platinum CV8 installed on a basement wall?

A) Position the membrane with the studs facing the wall and the smooth face towards the room. Arrange sheets so the flanged edges can be overlapped and sealed, keeping the membrane tight into corners rather than bridging them. Drill through the centre of appropriate studs into sound masonry using the supplied 10mm by 160mm SDS bit. Insert sealed Platinum Waterseal Brick Plugs and drive them home carefully with a rubber or club hammer. General fixing centres should not exceed 600mm, although closer spacing may be necessary around edges, openings or to suit the lining system. Control drilling dust so it does not fall into the cavity or channel. Inspect every plug, lap and penetration before covering the installation.

 

Q) How is the membrane fitted across a basement floor?

A) Floor installation normally involves loose-laying Platinum CV8 with its studs facing down over a sound, clean and level slab or screed. Plan sheet positions so laps, wall junctions, drainage channels, columns, sump openings and service penetrations can be detailed without unnecessary small pieces. Cut the HDPE carefully with a sharp blade and protect installed areas from rubble, tools and concentrated traffic. Seal overlaps with the specified Waterseal Tape, using additional compatible accessories where a flange is unavailable. The floor membrane must join the wall system continuously while allowing water to reach the designed channel or collection point. Before insulation, screed or boards are installed, test the drainage route and inspect the surface for punctures, open joints and trapped debris.

 

Q) How far apart should the Waterseal Brick Plugs be installed?

A) The product guidance states that Platinum Waterseal Brick Plugs should generally be installed at intervals no greater than 600mm. This is a maximum general spacing rather than a universal layout for every wall. More fixings may be needed at membrane edges, corners, openings, curved surfaces or where the background is uneven. The pattern should also coordinate with battens, boards, brackets or a stud frame so later finishes can use the sealed plug positions without introducing new holes. Each fixing must enter sound material and pass through the centre of a stud. Fit the required seal for below-ground waterproofing, seat the washer evenly and avoid overdriving it. A waterproofing designer or manufacturer should confirm spacing for unusual substrates or loads.

 

Q) How are membrane joints and overlaps sealed?

A) Use the membrane’s flat flanges for primary overlaps wherever possible. Apply Platinum Waterseal Tape to a clean, dry flange, align the adjoining sheet and compress the entire joint firmly so that no channels, creases or fish-mouths remain. On walls, vertical flanges should overlap the preceding membrane width in a direction that keeps water within the drainage cavity. Where two studded edges meet and a normal flange seal is impossible, the manufacturer identifies Platinum Waterseal Rope as the appropriate additional accessory. Corners, floor-to-wall junctions and complex cuts may also need Corner Tape or purpose-cut patches. Dust, condensation, grease and cold, poorly compressed seals can undermine butyl adhesion, so inspect every joint carefully before it becomes inaccessible.

 

Q) How should corners and awkward shapes be detailed?

A) Platinum CV8 can be cut and shaped around returns, columns, reveals and irregular basement geometry, but every cut creates a detail that must remain watertight and drain correctly. Press the membrane firmly into internal and external corners to form a defined angle; do not leave it spanning across a hollow corner. Use continuous folds where practical. Where cutting or mitring is unavoidable, seal the detail with the appropriate combination of Waterseal Tape, Waterseal Rope, Corner Tape or a membrane patch. Avoid excessive layers that cannot be compressed properly. Plan door thresholds, steps, pipe entries and floor transitions before cutting the main sheets. Photograph and test concealed details, and mark no-fix zones to prevent later trades puncturing vulnerable junctions.

 

Q) Does the CV8 kit need AquaTrack drainage or an AquaSump?

A) A cavity-drain membrane needs a reliable route by which collected water can leave the structure. Platinum AquaTrack is designed for the vulnerable wall-to-floor perimeter and can receive water draining from behind CV8. The channel then directs it to a lawful gravity outlet or to an AquaSump and pump system. Whether both products are required depends on levels, anticipated inflow and the available discharge point, but neither is listed as part of the standard CV8 kit. Channels should include accessible inspection and cleaning points, while pumps must be sized for flow, lift and pipe resistance. Where pump failure would be serious, twin pumps, alarms and backup power may be appropriate. The route should be tested before finishes conceal it.

 

Q) How should services passing through Platinum CV8 be sealed?

A) Minimise penetrations by placing pipes and cables on the room side of the membrane or within a planned service void wherever possible. When a service must pass through CV8, make the smallest neat opening that allows installation without tearing or distorting the sheet. Seal continuously around the penetration with a compatible system, commonly Waterseal Rope combined with Corner Tape, a membrane patch or a suitable proprietary collar. Clean and dry both the membrane and the service surface before applying butyl products. Consider pipe movement, vibration, heat and future replacement rather than making a rigid detail that may separate later. Floor penetrations require particular attention because leakage could enter insulation, screed or floor finishes without being immediately visible.

 

Q) Can the Platinum CV8 kit be fitted to vaulted ceilings or soffits?

A) Platinum CV8 can be fitted to vaulted, curved or sloping below-ground surfaces where water can drain continuously to a collection point. The sheets should follow the profile closely, with suitable fixing density to prevent sagging or pockets. Mitred joints and changes of plane must be sealed meticulously using the recommended tape, rope, corner tape or mesh tape as appropriate. The manufacturer states that the membrane is not suitable for a flat below-ground soffit; such a surface requires a minimum slope of 10 per cent for effective drainage. Overhead work also increases the importance of secure fixings, safe access and inspection. If water could pond above the membrane, a different professionally designed waterproofing solution should be selected.

 

Q) What tools and extra accessories may be needed for installation?

A) The kit supplies the correctly sized SDS drill bit, but installers will normally also need an SDS hammer drill, rubber or club hammer, sharp utility knife, tape measure, straightedge, level, marker, pressure roller, cleaning cloths and effective dust control. Additional materials depend on the detail and may include Waterseal Rope, Corner Tape, membrane patches, anti-lime sealer, fillet material, AquaTrack channel components, inspection ports, an AquaSump and pumps. Compatible insulation, flooring, battens, brackets or lining boards are required for the finish. Personal protective equipment should suit drilling, cutting and site conditions. Gather and check all system components before starting, because improvising corners, outlets or penetrations with unapproved products can compromise drainage and watertightness.

 

Q) Does Platinum CV8 require drying time before finishing?

A) The CV8 membrane itself requires no curing or extended drying period because it is a prefabricated HDPE sheet fixed mechanically to walls or laid over floors. Once the membrane, sealed joints, fixings, drainage connections and penetrations have been inspected and tested, the specified lining or floor build-up can generally proceed without waiting for the membrane to dry. This can reduce programme time compared with wet-applied tanking. Other materials remain subject to their own curing and moisture requirements, including repair mortars, screeds, biocides, anti-lime treatments, adhesives and plasterboard systems. The product guidance says atmospheric moisture should not exceed 70% relative humidity during finishing and impermeable flooring should wait until screed moisture is below 75% relative humidity.

 

Q) Can plaster or render be applied directly over Platinum CV8?

A) Platinum CV8 is a clear, non-meshed cavity-drain membrane, so conventional plaster or render should not normally be applied directly to its smooth surface. The usual approach is to install an appropriate independent stud frame, battens, brackets or another compatible dry-lining system on the room side. Fixing positions should be planned with the Waterseal Brick Plugs so later screws can engage approved plug cores without puncturing the membrane. The product guidance mentions No. 10 screws of 5mm diameter for fixing a stud frame to the plugs, but screw length must remain controlled. Where a directly plastered finish is essential, seek a purpose-designed meshed membrane system and confirm the complete specification rather than attempting to create an improvised key on CV8.

 

Q) What floor finishes can be installed above the membrane?

A) The manufacturer describes two typical floor build-ups above Platinum CV8. One option is suitable closed-cell insulation followed by tongue-and-groove flooring, maintaining a 10mm expansion joint around the perimeter. Another is a conventional sand-and-cement screed approximately 65mm thick. These are general arrangements rather than substitutes for structural and flooring design. The finished construction must distribute imposed loads, protect membrane studs and accommodate insulation, services, thresholds and drainage access. Site conditions may require different thicknesses, reinforcement or specialist boards. Moisture-sensitive and impermeable floor coverings should not be laid until the supporting screed has reached the specified moisture condition; the guidance gives below 75% relative humidity. Sump covers and channel access points must remain reachable after completion.

 

Q) What are the principal technical specifications of Platinum CV8?

A) The membrane is clear, semi-transparent high-density polyethylene with a stated unit weight of 0.5kg/m², sheet thickness of 0.45mm and individual stud height of 7mm, although it is marketed as an 8mm-class membrane. The product page reports a pass for watertightness at 60kPa for 24 hours under EN 1928. Listed tensile strengths are 416N in the machine direction and 488N across it. Static-load resistance exceeds 20kg, while compressive strength is stated as 180kN. The working temperature range is -50°C to +80°C, and softening temperature is 126°C. Reaction to fire is Class E, meaning the membrane should remain protected within a suitably designed building build-up.

 

Q) How durable is the Platinum CV8 membrane?

A) HDPE gives Platinum CV8 strong resistance to water, salts, alkalis, chemicals and common below-ground contaminants. The manufacturer states that, when stored and installed in accordance with its recommendations, the membrane’s life expectancy is equivalent to the lifetime of the structure. This refers to the durable sheet material and does not mean the whole waterproofing installation can be ignored indefinitely. Joint integrity, later punctures, drainage cleanliness, pumps, alarms and discharge pipework all influence long-term performance. The membrane should be stored upright, under cover and away from high temperatures, direct sunlight and open flames. Rolls with crushed studs, damaged flanges or heat distortion should be assessed before use, because defects may reduce drainage or prevent reliable sealing.

 

Q) What maintenance does a completed CV8 waterproofing system need?

A) The concealed CV8 sheet normally requires little direct maintenance, but the water-management system connected to it must remain accessible and operational. AquaTrack inspection points should be retained so channels can be examined and flushed if lime, sediment or debris accumulates. Sumps should be cleaned, pump floats operated, non-return valves checked and discharge pipes inspected. Test high-water alarms, secondary pumps and backup batteries at the intervals recommended by their manufacturers. Maintenance frequency should reflect groundwater risk, pump activity, system design and any warranty conditions. Keep installation drawings and photographs showing channels, junctions, plug rows and no-fix areas. Owners and later contractors should know that careless drilling, inaccessible access covers or blocked channels can defeat an otherwise durable membrane installation.

 

Q) Does Platinum CV8 stop condensation, mould and rising damp?

A) Platinum CV8 controls moisture entering through walls or floors and separates finishes from damp or salt-contaminated masonry, but it does not remove water vapour generated inside the room. Cooking, showering, clothes drying, occupation and cold surfaces can still create condensation and mould unless heating, insulation and ventilation are appropriate. The manufacturer particularly recommends effective mechanical ventilation in poorly ventilated spaces and wet rooms. On floors, the membrane may help isolate finishes from ground moisture when incorporated into a complete drained system, but the source and pathway must still be diagnosed correctly. Above ground, avoidable moisture should be addressed at source, potentially including a suitable damp-proof course. Do not assume every damp patch indicates either condensation or membrane failure without investigation.

 

Q) What are the main limitations of the Platinum CV8 Basement Tanking Membrane Kit?

A) The kit is not a stand-alone answer to hydrostatic water pressure because CV8 must discharge into a continuous, maintainable drainage system. AquaTrack, sumps, pumps, corner products and service seals are not automatically included. The membrane cannot correct structural instability, active movement, untreated dry rot or avoidable leaks, and it does not control internally generated condensation. Direct plastering is unsuitable because CV8 has no mesh key. Flat below-ground soffits are excluded unless an effective minimum 10% drainage slope exists. Butyl seals need clean, dry surfaces, and the membrane must be protected from punctures, prolonged sunlight, extreme heat and flame. Complex, high-risk or habitable schemes should be designed and installed by competent waterproofing specialists using current standards and project-specific details.

 

Q) What practical tips help produce a reliable CV8 installation?

A) Survey and design the full water route before unrolling the membrane, including channels, outlets, sump position, inspection points and final lining supports. Prepare a sheet layout that uses flanged joints efficiently and allows for corners, reveals and wastage. Keep the membrane and butyl products clean, dry and protected; control drill dust so it cannot settle in the cavity. Fix through stud centres, seat every plug seal evenly and use planned plug rows for later framing. Compress tapes continuously and repair accidental holes before concealment. Water-test channels, operate pumps and alarms, and photograph all critical details and no-fix zones. Finally, preserve access for servicing and provide the owner with system drawings, product instructions and a realistic maintenance schedule.