Platinum CV8 MESH - Basement Tanking Membrane (8mm Stud)

Platinum CV8 MESH is a High Quality, 8mm Stud, Basement Waterproofing Tanking Membrane comprising of HDPE Membrane with a strong polyethylene mesh on the surface of one side. 

The meshed surface creates a mechanical key to allow the membrane to be plastered, rendered or to receive dot & dab plasterboard.

Available in (W) 2.0M x (L) 10M (20M²) and (W) 2.0M x (L) 20M (40M²) Rolls.

Size

Size
Sale price £220.50 Regular price
ex. VAT
Regular price £264.60 £264.60 Sale price Regular price £0.00
inc. VAT

Platinum CV8 MESH is a High Quality, 8mm Stud, Basement Waterproofing Tanking Membrane comprising of HDPE Membrane with a strong polyethylene mesh on the surface of one side. 

The meshed surface creates a mechanical key to allow the membrane to be plastered, rendered or to receive dot & dab plasterboard.

Available in (W) 2.0M x (L) 10M (20M²) and (W) 2.0M x (L) 20M (40M²) Rolls.

Free Delivery

on orders over £100
(ex. VAT, mainland UK only)

Free Help & Advice

Call 01355 222 777
Mon.-Fri 8:30am - 4:15pm, or email us

Next Day Delivery

Order Before 2:30pm for Same Day Despatch (terms apply)

Great Service

A proudly independent family business with 40 years experience

Platinum CV8 MESH Cavity Drain Membrane

Platinum CV8 Mesh is a high quality Cavity Drain Waterproofing Membrane comprising of high density polyethylene membrane with a strong polyethylene mesh heat-welded during the manufacturing process to the surface of one side. 

The meshed surface creates a mechanical key to allow the membrane to be plastered, rendered or to receive dot & dab plasterboard.

Platinum CV8 Mesh is suitable for the waterproofing of earth retained walls and vaulted soffits and is guaranteed against deterioration for 30 years, with a life expectancy of the design life of the building (DIN 9001:2000).

Platinum CV8 Mesh is inert and, therefore, non-polluting to drinking water, highly resistant to water, alkalines, saline solutions and organic acids, and not affected by minerals and hydrocarbons. It is also rot-proof, and resistant to bacteria, fungi and other small organisms.

Benefits & Features:

  • High Performance Bonded Mesh

  • Part of a Type C Cavity Drain Membrane System in Line With BS8102:2009

  • Waterproof, Salt Inhibiting, Root and Contaminate Resistant

  • Creates a Dry, Habitable Living Space in Areas Previously Suffering From Damp / Wet Conditions

  • Easily Cut Down Using a Sharp Blade

  • Easy to Fold Around Windows and Doors

  • Quick to Install - Minimal Preparation Needed to Wall Surfaces

  • No Drying Out Process - Redecoration Can Occur Immediately

  • Little or No Damage to the Existing Structure

Technical Data:

Material High Density Polyethylene (HDPE)
Unit Weight 0.505kg/m²
Sheet Thickness 0.6mm
Stud Height 7mm
Colour Clear
Water Tightness - 60 kPa; 24h (EN 1928) Pass
Working Temperature -50°C to +80°C
Softening Temperature 126°C
Tensile Strength MD (BS 12311-2) 416 N
Tensile Strength CD (BS 12311-2) 488 N
Resistance to Static Loading (BS 12730) >20 Kg
Compressive Strength (BS EN ISO 25619-2) 180 kN
Reaction to Fire (BS EN 13501-1 :2007+A1:2009) Class F
Type of Application Type V
Life Expectancy Lifetime of Structure

Preparation:

Unsound plaster, render or screed should be removed and surfaces made level. This can be achieved using Universal Mortar, or a 3:1 sand:cement mix incorporating Renderproof Waterproofing Additive.

Leave all new works to dry thoroughly before any membranes are fixed.

In case of walls suffering from mould or masonry fungi, prior to fixing the membrane, remove surface contamination by brushing, then apply a Masonry Biocide in line with the relevant Technical Data Sheet

If Dry Rot (Serpula Lacrymans) is present in the walls, this will require detailed assessment before proceeding.

Above ground level it is recommended, that where possible, all sources of moisture are alleviated at the source using a DPC such as DampSolve, before applying Platinum CV8 Mesh Membrane. This reduces potential damage to masonry and timber etc.

We recommend an application of Wykamol Anti Lime Sealer to the concrete walls, before an application of CV8 Mesh Membrane, to prevent lime efflorescence and dusting, which can block perimeter drainage channels.

Application on Walls:

Platinum CV8 Mesh is fixed with the studs against the wall to create an air / depressurisation gap.

The membrane can be fixed either vertically or horizontally. However as this product is not available in 2.4M height and also due to the heavy weight of the material, most fixing of Platinum CV8 Mesh will be Vertical.

When making this decision, you will need to take into account the size of the area to be lined, and the height of the walls relative to the width of the membrane.

Horizontal Fixing requires less cuts and jointing but the full roll is very heavy at first. Vertical fixing has much lighter strips to fix, but requires that each of these is taped back together again. You may find that vertical fixing is easier, but requires more Waterseal Tape for jointing.

The membrane is fixed to the wall using Platinum Waterseal Brick Plugs.

Place the membrane in position as level as you can judge by eye. Using a 10mm drill bit, drill through the centre of a stud near the top and edge to a depth greater than the fixing.

The fixing is then hammered into the pre-drilled hole until the plug sits flush in the stud. The rubber washer re-seals the hole. Level the membrane using the spirit level or laser level if used, and fix another plug about 2 metres along at the top of the sheet. The membrane will now be hanging level to the wall.

If you are fixing horizontally, continue fixing every 2 metres until you have reached the end of the roll or you have covered all of the wall(s) to be treated. It is very important to regularly check the level. If the membrane is not level, you may well find that the membrane is kinked and looks unsightly, it will also dive down when fitted around corners.

If you are fixing Vertically, hang each subsequent sheet by the two fixings as described above. The subsequent sheet is joined by overlapping the edge of one sheet by another underneath by a minimum of 2 studs. Fix Brick Plugs & Seals through the studs as close as possible to the edge of the membrane.

Apply Platinum Mesh Tape along the joint with equal overlaps of the tape onto each sheet of membrane and press firmly into place.

Apply more pressure with the palm of your hand to further seal the whole of the joint. A Hot Air Gun should be used to help sealing, especially in cold or damp conditions.

Fixing Centres:

Fix in a square at 350mm centres, and then fix a plug in the centre of four fixings so it looks like a 5 on a dice.

All fixings will then be a maximum of 250mm centres.

On very flat walls, the horizontal and vertical centres can be moved out to 400mm so when the centre plug is fixed, the centres are not more than 300mm.

Platinum CV8 Mesh Membrane can be plastered or rendered, or can be plasterboarded using a dab fix.

Plasters:

The recommended plaster to be applied to Platinum CV8 Mesh is Tarmac Whitewall which should be in two coats when applied to Platinum Mesh Membranes.

The plasters can accept a finishing 3mm skim coat to finish.

Note: Manufacturers recommended drying times may vary according to atmospheric conditions.

Cement Based Renders:

For internal cement renders the mix should be six parts clean sharp sand / one part lime / one part cement. A two-coat application is recommended allowing 7-10 days between coats.

Drying time is important because shrinkage cracks may appear.

A weaker mix of seven or even eight parts sand can be used for the second coat.

Hydraulic Lime Based Mortars:

First Coat

Using a ratio of 1 part Lime to 2½ - 3 parts sharp washed sand with evenly distributed hair throughout the mortar and working to a layer of 10mm thick, push the plaster into and across the pre-wet laths at a 45 degree angle to the lathes.

The plaster should be correctly cured until hard

Second Coat

The second coat also known as the intermediate or float coat will be applied similar to the first coat only without any hair being added to the mortar.

You must ensure you wet down the first coat with a fine mist before spreading a 7mm coat, before scratching up and leaving in preparation of the finish coat.

Finish Coat

For the final top coat a fine mix of 1 part lime putty to 2 parts well graded super fine sand. Remembering to wet down the surface before application with a fine mist spray.

Allow time for the water to absorb into the plaster then apply a coat of approximately 5mm, then rule off and leave for a couple of hours.

When ready, rub up the finish coat using a plastic or wooden trowel to bring back the fat until the required finish has been reached in the case of any light crazing this can be rubbed up and trowelled out.

General Plastering & Rendering Considerations:

Note: All plasters and renders etc. must be to a minimum total depth of 15mm.

The undercoat should be applied with firm pressure to ensure the product is fully pushed behind the mesh so that the studs are fully filled, and to an approximate thickness of 5mm and be well scratched with a wire scratcher.

When the scratch coat has set, the floating coat should be applied to a depth of 7mm and lightly scratched to provide a firm key for the final coat, which should be to a minimum thickness of 3mm.

All plasters and renders should be applied strictly in accordance with the manufacturer’s instructions, and good plastering / rendering practice as described in BS5492 and BS5262 Code of Practice.

Do not apply decoration until the plaster or render is thoroughly dry.

If any special renders or plasters are to be considered, technical advice must be sought from the Company’s technical department.

Curing:

Note: Cement and Lime based mortars require curing. Curing is the process of keeping a mortar or render under a specific environmental condition until the chemical set (referred to as hydration) is sufficient to withstand the environment into which the mortar has been placed.

Lime binders are generally weaker than cements taking longer to acquire their strength and hardness, leaving them potentially more vulnerable for a longer period than cement equivalents, and curing them once placed is simply regarded as best practice.

Good curing is typically considered to be that of providing a humid environment stimulating full hydration of the lime or cement binders, providing strength development along with other benefits, especially the ability to withstand hairline cracking.

The most common cause of failure is allowing a mortar / render to dry out too quickly, impeding the chemical process for hydration, stressing the mortar resulting in cracking.

Standard practice for protecting cement or lime based renders/mortars is with wet / dampened hessian sheeting draped over the area in relatively close proximity to the render. This should be left in place for at least a week and is a standard requirement that is required in all cases.

During the warmer months, the hessian will need to be repeatedly wetted and/or covered with plastic sheeting to ensure the correct curing environment.

Curing should be of at least 7 days.

Dry Lining:

Platinum CV8 Mesh can be effectively used in conjunction with dry lining by dab fixing the plasterboard using a proprietary dabbing compound.

Be careful when installing laminated or insulated plasterboard, as when they are dot & dabbed to Platinum Meshed membranes, building regulations require two mechanical fixes to each laminated board. These fixings may breach the membrane which cannot be repaired.

Where insulation is required to the wall build, we recommend to use a NON-MESHED Membrane (such as Platinum CV8) and use an independent dry-lining frame.

House the insulation within the frame and plasterboard over.

Technical Data Sheet:

Coming Soon

Declaration of Performance (DoP):

Platinum CV8 MESH Cavity Drain Membrane

Platinum CV8 Mesh is a high quality Cavity Drain Waterproofing Membrane comprising of high density polyethylene membrane with a strong polyethylene mesh heat-welded during the manufacturing process to the surface of one side. 

The meshed surface creates a mechanical key to allow the membrane to be plastered, rendered or to receive dot & dab plasterboard.

Platinum CV8 Mesh is suitable for the waterproofing of earth retained walls and vaulted soffits and is guaranteed against deterioration for 30 years, with a life expectancy of the design life of the building (DIN 9001:2000).

Platinum CV8 Mesh is inert and, therefore, non-polluting to drinking water, highly resistant to water, alkalines, saline solutions and organic acids, and not affected by minerals and hydrocarbons. It is also rot-proof, and resistant to bacteria, fungi and other small organisms.

Benefits & Features:

  • High Performance Bonded Mesh

  • Part of a Type C Cavity Drain Membrane System in Line With BS8102:2009

  • Waterproof, Salt Inhibiting, Root and Contaminate Resistant

  • Creates a Dry, Habitable Living Space in Areas Previously Suffering From Damp / Wet Conditions

  • Easily Cut Down Using a Sharp Blade

  • Easy to Fold Around Windows and Doors

  • Quick to Install - Minimal Preparation Needed to Wall Surfaces

  • No Drying Out Process - Redecoration Can Occur Immediately

  • Little or No Damage to the Existing Structure

Technical Data:

Material High Density Polyethylene (HDPE)
Unit Weight 0.505kg/m²
Sheet Thickness 0.6mm
Stud Height 7mm
Colour Clear
Water Tightness - 60 kPa; 24h (EN 1928) Pass
Working Temperature -50°C to +80°C
Softening Temperature 126°C
Tensile Strength MD (BS 12311-2) 416 N
Tensile Strength CD (BS 12311-2) 488 N
Resistance to Static Loading (BS 12730) >20 Kg
Compressive Strength (BS EN ISO 25619-2) 180 kN
Reaction to Fire (BS EN 13501-1 :2007+A1:2009) Class F
Type of Application Type V
Life Expectancy Lifetime of Structure

Preparation:

Unsound plaster, render or screed should be removed and surfaces made level. This can be achieved using Universal Mortar, or a 3:1 sand:cement mix incorporating Renderproof Waterproofing Additive.

Leave all new works to dry thoroughly before any membranes are fixed.

In case of walls suffering from mould or masonry fungi, prior to fixing the membrane, remove surface contamination by brushing, then apply a Masonry Biocide in line with the relevant Technical Data Sheet

If Dry Rot (Serpula Lacrymans) is present in the walls, this will require detailed assessment before proceeding.

Above ground level it is recommended, that where possible, all sources of moisture are alleviated at the source using a DPC such as DampSolve, before applying Platinum CV8 Mesh Membrane. This reduces potential damage to masonry and timber etc.

We recommend an application of Wykamol Anti Lime Sealer to the concrete walls, before an application of CV8 Mesh Membrane, to prevent lime efflorescence and dusting, which can block perimeter drainage channels.

Application on Walls:

Platinum CV8 Mesh is fixed with the studs against the wall to create an air / depressurisation gap.

The membrane can be fixed either vertically or horizontally. However as this product is not available in 2.4M height and also due to the heavy weight of the material, most fixing of Platinum CV8 Mesh will be Vertical.

When making this decision, you will need to take into account the size of the area to be lined, and the height of the walls relative to the width of the membrane.

Horizontal Fixing requires less cuts and jointing but the full roll is very heavy at first. Vertical fixing has much lighter strips to fix, but requires that each of these is taped back together again. You may find that vertical fixing is easier, but requires more Waterseal Tape for jointing.

The membrane is fixed to the wall using Platinum Waterseal Brick Plugs.

Place the membrane in position as level as you can judge by eye. Using a 10mm drill bit, drill through the centre of a stud near the top and edge to a depth greater than the fixing.

The fixing is then hammered into the pre-drilled hole until the plug sits flush in the stud. The rubber washer re-seals the hole. Level the membrane using the spirit level or laser level if used, and fix another plug about 2 metres along at the top of the sheet. The membrane will now be hanging level to the wall.

If you are fixing horizontally, continue fixing every 2 metres until you have reached the end of the roll or you have covered all of the wall(s) to be treated. It is very important to regularly check the level. If the membrane is not level, you may well find that the membrane is kinked and looks unsightly, it will also dive down when fitted around corners.

If you are fixing Vertically, hang each subsequent sheet by the two fixings as described above. The subsequent sheet is joined by overlapping the edge of one sheet by another underneath by a minimum of 2 studs. Fix Brick Plugs & Seals through the studs as close as possible to the edge of the membrane.

Apply Platinum Mesh Tape along the joint with equal overlaps of the tape onto each sheet of membrane and press firmly into place.

Apply more pressure with the palm of your hand to further seal the whole of the joint. A Hot Air Gun should be used to help sealing, especially in cold or damp conditions.

Fixing Centres:

Fix in a square at 350mm centres, and then fix a plug in the centre of four fixings so it looks like a 5 on a dice.

All fixings will then be a maximum of 250mm centres.

On very flat walls, the horizontal and vertical centres can be moved out to 400mm so when the centre plug is fixed, the centres are not more than 300mm.

Platinum CV8 Mesh Membrane can be plastered or rendered, or can be plasterboarded using a dab fix.

Plasters:

The recommended plaster to be applied to Platinum CV8 Mesh is Tarmac Whitewall which should be in two coats when applied to Platinum Mesh Membranes.

The plasters can accept a finishing 3mm skim coat to finish.

Note: Manufacturers recommended drying times may vary according to atmospheric conditions.

Cement Based Renders:

For internal cement renders the mix should be six parts clean sharp sand / one part lime / one part cement. A two-coat application is recommended allowing 7-10 days between coats.

Drying time is important because shrinkage cracks may appear.

A weaker mix of seven or even eight parts sand can be used for the second coat.

Hydraulic Lime Based Mortars:

First Coat

Using a ratio of 1 part Lime to 2½ - 3 parts sharp washed sand with evenly distributed hair throughout the mortar and working to a layer of 10mm thick, push the plaster into and across the pre-wet laths at a 45 degree angle to the lathes.

The plaster should be correctly cured until hard

Second Coat

The second coat also known as the intermediate or float coat will be applied similar to the first coat only without any hair being added to the mortar.

You must ensure you wet down the first coat with a fine mist before spreading a 7mm coat, before scratching up and leaving in preparation of the finish coat.

Finish Coat

For the final top coat a fine mix of 1 part lime putty to 2 parts well graded super fine sand. Remembering to wet down the surface before application with a fine mist spray.

Allow time for the water to absorb into the plaster then apply a coat of approximately 5mm, then rule off and leave for a couple of hours.

When ready, rub up the finish coat using a plastic or wooden trowel to bring back the fat until the required finish has been reached in the case of any light crazing this can be rubbed up and trowelled out.

General Plastering & Rendering Considerations:

Note: All plasters and renders etc. must be to a minimum total depth of 15mm.

The undercoat should be applied with firm pressure to ensure the product is fully pushed behind the mesh so that the studs are fully filled, and to an approximate thickness of 5mm and be well scratched with a wire scratcher.

When the scratch coat has set, the floating coat should be applied to a depth of 7mm and lightly scratched to provide a firm key for the final coat, which should be to a minimum thickness of 3mm.

All plasters and renders should be applied strictly in accordance with the manufacturer’s instructions, and good plastering / rendering practice as described in BS5492 and BS5262 Code of Practice.

Do not apply decoration until the plaster or render is thoroughly dry.

If any special renders or plasters are to be considered, technical advice must be sought from the Company’s technical department.

Curing:

Note: Cement and Lime based mortars require curing. Curing is the process of keeping a mortar or render under a specific environmental condition until the chemical set (referred to as hydration) is sufficient to withstand the environment into which the mortar has been placed.

Lime binders are generally weaker than cements taking longer to acquire their strength and hardness, leaving them potentially more vulnerable for a longer period than cement equivalents, and curing them once placed is simply regarded as best practice.

Good curing is typically considered to be that of providing a humid environment stimulating full hydration of the lime or cement binders, providing strength development along with other benefits, especially the ability to withstand hairline cracking.

The most common cause of failure is allowing a mortar / render to dry out too quickly, impeding the chemical process for hydration, stressing the mortar resulting in cracking.

Standard practice for protecting cement or lime based renders/mortars is with wet / dampened hessian sheeting draped over the area in relatively close proximity to the render. This should be left in place for at least a week and is a standard requirement that is required in all cases.

During the warmer months, the hessian will need to be repeatedly wetted and/or covered with plastic sheeting to ensure the correct curing environment.

Curing should be of at least 7 days.

Dry Lining:

Platinum CV8 Mesh can be effectively used in conjunction with dry lining by dab fixing the plasterboard using a proprietary dabbing compound.

Be careful when installing laminated or insulated plasterboard, as when they are dot & dabbed to Platinum Meshed membranes, building regulations require two mechanical fixes to each laminated board. These fixings may breach the membrane which cannot be repaired.

Where insulation is required to the wall build, we recommend to use a NON-MESHED Membrane (such as Platinum CV8) and use an independent dry-lining frame.

House the insulation within the frame and plasterboard over.

Technical Data Sheet:

Coming Soon

Declaration of Performance (DoP):

You Might Also Like

On Sale